7
PUMA 480LM
P48LMISE98
5) The holes for the second mortar work should comply with the specifications in the
detailed diagram above.
6) Prepare oils, power source and air source before the machine arrives on the site.
7) Adjust the height of the machine so that it is 5mm to 10mm high from the ground.
To facilitate the work on the coolant tank, measure the height between coolant tank
and ground beforehand.