
G643 (E) Service Manual Chapter 3. Engine Mechanical System
40
Cylinder Heads
Tools Needed
A
Torque Angle Meter
1
NOTE
: When installing the cylinder heads use a
new head gasket. Do not use sealer on the
composite gasket.
Tighten the cylinder head bolts in the following
sequence.
All bolts are torqued to a torque of
30 N·m (22 lb·ft)
.
On the second pass a tool A degree wheel must be
used.
Bolts in sequence.
1
. Short length bolts (11, 7, 3, 2, 6, 10) 55 degrees
2
. Medium length bolts (12, 13) 65 degrees
3
. Long length bolts (1, 4, 8, 5, 9) 75 degrees
Valve Clearence
(1) The 4.3 liter engine has screw-in rocker arm
studs with positive stop shoulders, NO valve
adjustment is necessary. When the valve train
requires service you simply tighten the rocker
arm nuts to
25 N·m (18 lb·ft)
.
Содержание G643
Страница 2: ......
Страница 4: ......
Страница 43: ...G643 E Service Manual Chapter 3 Engine Mechanical System 41 Engine Exploded View...
Страница 45: ...G643 E Service Manual Chapter 3 Engine Mechanical System 43...
Страница 132: ...G643 E Service Manual Chapter 4 Engine Electrical System 130 2 Alternator and outer terminal connection inspection...
Страница 181: ...G643 E Service Manual Chapter 5 Engine Management System EMS 179 SECM Wiring Diagrams for G643 LP Engine...
Страница 182: ...G643 E Service Manual Chapter 5 Engine Management System EMS 180...
Страница 260: ......