
G643(E) Service Manual
Chapter 6. LPG FUEL DELIVERY SYSTEM
194
Hose Connections
Proper operation of the closed loop control greatly
depends on the correct vacuum hose routing and
fuel line lengths. Refer to the connection diagrams
below for proper routing and maximum hose lengths
when reinstalling system components.
NOTE:
Preferred mounting of regulator is off engine.
Hose Specifications
Vacuum hose to comply to SAE 1403 Type I or SAE
J30 R7 R8 / EPDM textile reinforced / -40
°
F to
+257
°
F (-40
°
C +125
°
C / Inside Diameter: 7/32”
(5.56mm)
Certified System Connections
DWG NO 5555-1201
Figure 26. Hose Connections for Certified Systems
Содержание G643
Страница 2: ......
Страница 4: ......
Страница 43: ...G643 E Service Manual Chapter 3 Engine Mechanical System 41 Engine Exploded View...
Страница 45: ...G643 E Service Manual Chapter 3 Engine Mechanical System 43...
Страница 132: ...G643 E Service Manual Chapter 4 Engine Electrical System 130 2 Alternator and outer terminal connection inspection...
Страница 181: ...G643 E Service Manual Chapter 5 Engine Management System EMS 179 SECM Wiring Diagrams for G643 LP Engine...
Страница 182: ...G643 E Service Manual Chapter 5 Engine Management System EMS 180...
Страница 260: ......