
G643 (E) Service Manual Chapter 3. Engine Mechanical System
100
Figure 12-77 Installing Camshaft
Timing Chain and Camshaft Sprocket
Installation
Figure 12-78
Install or Connect
1
. Camshaft sprocket and timing chain (figure 12-78).
IMPORTANT: Line up the timing marks on the
camshaft sprocket and crankshaft sprocket
(view A, figure 12-78). The number 4 cylinder is
at top dead center of the compression stroke
with the timing marks in this position.
2
. Camshaft sprocket bolts and nut.
Tighten
• Camshaft sprocket bolts and nut to 28 N
∙
m
(21 lb· ft.).
Figure 12-78 Camshaft Timing Chain and Sprockets
Engine Front Cover Installation
IMPORTANT: Once the composite front engine
cover is removed, DO NOT reinstall it. Always
install a new engine front cover.
Install or Connect
1
. Engine front cover to engine.
2
. Front cover bolts.
NOTICE
: Refer to “Notice” on page 1.
Tighten
• Front cover to block bolts to 9 N
∙
m (80 lb. in.).
Содержание G643
Страница 2: ......
Страница 4: ......
Страница 43: ...G643 E Service Manual Chapter 3 Engine Mechanical System 41 Engine Exploded View...
Страница 45: ...G643 E Service Manual Chapter 3 Engine Mechanical System 43...
Страница 132: ...G643 E Service Manual Chapter 4 Engine Electrical System 130 2 Alternator and outer terminal connection inspection...
Страница 181: ...G643 E Service Manual Chapter 5 Engine Management System EMS 179 SECM Wiring Diagrams for G643 LP Engine...
Страница 182: ...G643 E Service Manual Chapter 5 Engine Management System EMS 180...
Страница 260: ......