Dryflo, MMA and MMB
18
Integral Housed Fans
1. The fan blower assembly housing is integral to the collector. The wheel and
motor are bolted to the housing.
Note: Wheel assembly should extend 1/8 +0.0 to -1/16 past the top of the
inlet ring when properly installed.
Torque set screw to 10-11 Ft Lb, not to exceed 13-Ft Lb for aluminum hubs
(typical).
For steel hubs, set torque to 11-13 Ft Lb, not to exceed 14-Ft Lb
2. Rotate fan wheel after installation to ensure proper rotation.
Machine Mount
1.
Position the mist collector’s inlet so the air flows through the
machine center, across the chuck, and into the collector.
2.
Apply a generous amount of sealant to the mounting flange.
3. Lift collector over machine center and lower slowly. Secure using
hardware supplied.
Inlet Gasket
1. Lift the collector into position over the machine center and lower
slowly.
2.
Open the collector’s access door and remove the filter cartridge,
filter retention mechanism, and the first-stage filter.
3.
Trace the lower hopper opening onto the machine center, cut hole,
and remove collector.
4. Align the bolt template with the cut out and match-drill the bolt holes using a 5/16-in diameter drill bit. Remove and discard
template.
5. Remove the protective backing from the gasket and apply to the machine
center adhesive side down.
6.
Lift collector into position and lower slowly. Fasten using 6mm bolts,
washers, and hex nuts supplied.
Start bolts from the inside of the machine center. Do not
overtighten. Compress gasket 3/16-in maximum.
7. Install a bolt into every rivnut hole.
Sealant
sealant
Inlet Gasket
inlet gasket
washer
bolt