background image

4445103557 / 2021-08-05/ Page 8 of 8 

Sealing in the middle at the bottom 

1.

 

Glue the other pcs. of the 13 cm long stripes of the 

sealing tape at the EPP part as shown. The overlapping 

shall be between 5 and 8 mm and the sealing tape shall 

be positioned centered. 

2.

 

Fold the sealing tape down and glue it to the EPP part 

and the other sealing tape that was glued before. 

Caution! 

Before gluing check the correct positioning of the 

sealing tape. The gluing must be done carefully to 

ensure that the gaps are closed, and no water can 

splash through. 

 

 

Sealing of the side walls with the sealing tapes 

1.

 

Use 2 pcs. of 3cm long sealing tapes to seal at the sides 

of the sheet metal the gap between the plastic part and 

the metal sheet as shown. 

Caution! 

Before gluing check the correct positioning of the 

sealing tape. The gluing must be done carefully to 

ensure that the gaps are closed, and no water can 

splash through. 

 

 

Sealing of the right side with the last sealing tape 

Use 1 pcs. of the 3 cm long sealing tapes to seal the 

gap between the sheet metal and the plastic wall at the 

right side of the sheet metal. 

Caution! 

Before gluing check the correct positioning of the 

sealing tape. The gluing must be done carefully to 

ensure that the gaps are closed, and no water can 

splash through. 

2.

 

When the sheet metals with the plastic part are 

completely sealed follow the working steps on page 1 

& 2 in the reverse order and use the new screws to fix 

the outer housing. 

Caution! 

Place the plastic clip with the temperature sensor at the 

same position at the evaporator (Page 2). 
Make sure the cables do not touch any components on 

the control PCB (heat sink, etc.) and that the cable of 

the water level switch will not touch the edge of the 

sheet metal after reconnection. 
Check whether the condensate hose and cables are 

routed and fixed at the same (correct) position. 

 

NOTICE: When reassembling the unit make sure that no cables are pinched and all lose parts (cable tie residues, etc.) are removed   from    the system.

 

 
Check the function in a concluding test run.

 

 

Содержание SPX1200T

Страница 1: ...Sealing round cord length each 160mm 3 pcs Cable tie length 150mm 1 pcs Water barrier_front 1 pcs Water barrier_ back 10 pcs Fastening screws for fixation of outer housing not shown STEP 1 PREPARE TH...

Страница 2: ...he evaporator inlet and then unlocking the lid counterclockwise along the edge Loosen cable fixings 1 Carefully cut the marked cable ties Disassemble temperature sensor 1 Carefully remove the marked p...

Страница 3: ...bracket below the evaporator as shown 2 Apply one piece of the 13 cm long butyl round cord from below into the groove of the plastic support so that on each side approx 3 cm of this butyl round cord p...

Страница 4: ...nd press onto the edges where the butyl round cord is below of to seal this area 2 Bring back the evaporator to its original position and fix it with the two screws left and right Loosen the water hos...

Страница 5: ...e of the plastic water basin as shown 2 To do this insert the metal sheet first at the left side between the plastic wall and the metal bracket of the evaporator 1 3 To check Correct orientation of th...

Страница 6: ...edges of the sheet metal blue arrow Assembling of the front sheet metal 1 Assemble the sheet metal in front of the evaporator at the inside of the plastic water basin as shown 2 To do this insert the...

Страница 7: ...ing tape and glue it to the plastic and EPP part as shown at the left and the right side Caution Before gluing check the correct orientation of the part and the positioning of the sealing tape The glu...

Страница 8: ...of the right side with the last sealing tape Use 1 pcs of the 3 cm long sealing tapes to seal the gap between the sheet metal and the plastic wall at the right side of the sheet metal Caution Before...