background image

4445103557 / 2021-08-05/ Page 5 of 8 

 

STEP 3: SEALING ON THE BACK OF THE EVAPORATOR 
Preparing the sheet metal for the backside 

1.

 

Glue the 24 cm long stripe of the sealing tape centered 

at the inside of the straight sheet metal as shown. The 

overlapping shall be between 2 and 5 mm. 

Caution! 

Do not touch the sheet metal parts without wearing 

work gloves as the acidic hand sweat etches the 

fingerprints even into stainless steel surfaces and to 

avoid injuries. 
Before gluing check the correct orientation of the part 

and the positioning of the sealing tape. The gluing must 

be done carefully to ensure that the gaps are closed, 

and no water can splash through. 

 

 

Assembling of the sheet metal for the back side 

1.

 

Assemble the sheet metal at the back of the evaporator 

at the inside of the plastic water basin as shown. 

2.

 

To do this insert the metal sheet first at the left side 

between the plastic wall and the metal bracket of the 

evaporator (1.) 

3.

 

To check: Correct orientation of the part is when the 2 

short bends left and right of the sheet metal are at the 

bottom and point in the direction of the evaporator. 

4.

 

Move the sheet metal down (2.) and at the same time 

move it to the right (3.) until it fits in the yellow marked 

area. 

5.

 

Glue the protruding ends of the butyl round cord to the 

sheet metal as shown to close the gap in this area. 

Caution! 

Before gluing check the correct orientation of the part 

and the positioning of the sealing tape. The gluing must 

be done carefully to ensure that the gaps are closed, 

and no water can splash through. 

 

 

 

 

Sealing in the middle with the sealing tape 

1.

 

Press the sheet metal to the plastic wall, fold down the 

sealing tape and glue it to the plastic and EPP part as 

shown. 

 

 

 

Side with the glue 

2-5 mm overlapping 

1.

 

2.

 

3.

 

Содержание SPX1200T

Страница 1: ...Sealing round cord length each 160mm 3 pcs Cable tie length 150mm 1 pcs Water barrier_front 1 pcs Water barrier_ back 10 pcs Fastening screws for fixation of outer housing not shown STEP 1 PREPARE TH...

Страница 2: ...he evaporator inlet and then unlocking the lid counterclockwise along the edge Loosen cable fixings 1 Carefully cut the marked cable ties Disassemble temperature sensor 1 Carefully remove the marked p...

Страница 3: ...bracket below the evaporator as shown 2 Apply one piece of the 13 cm long butyl round cord from below into the groove of the plastic support so that on each side approx 3 cm of this butyl round cord p...

Страница 4: ...nd press onto the edges where the butyl round cord is below of to seal this area 2 Bring back the evaporator to its original position and fix it with the two screws left and right Loosen the water hos...

Страница 5: ...e of the plastic water basin as shown 2 To do this insert the metal sheet first at the left side between the plastic wall and the metal bracket of the evaporator 1 3 To check Correct orientation of th...

Страница 6: ...edges of the sheet metal blue arrow Assembling of the front sheet metal 1 Assemble the sheet metal in front of the evaporator at the inside of the plastic water basin as shown 2 To do this insert the...

Страница 7: ...ing tape and glue it to the plastic and EPP part as shown at the left and the right side Caution Before gluing check the correct orientation of the part and the positioning of the sealing tape The glu...

Страница 8: ...of the right side with the last sealing tape Use 1 pcs of the 3 cm long sealing tapes to seal the gap between the sheet metal and the plastic wall at the right side of the sheet metal Caution Before...

Отзывы: