background image

4445103557 / 2021-08-05/ Page 6 of 8 

 

Sealing left and right with 2 other sealing tapes 

1.

 

Use the 2 pcs. of 5,5cm long sealing tapes to seal the 

gap between the sheet metal and the plastic wall at the 

left and the right in the same way as shown. 

 

 

 

STEP 4: SEALING IN FRONT OF THE EVAPORATOR 
Preparing the sheet metal 

1.

 

Glue 2 pcs. of the 11cm long stripes of the sealing tape 

at the other sheet metal part as shown. The 

overlapping shall be between 2 and 5mm and the 

sealing tape shall be positioned at the inside edges of 

the sheet metal (blue arrow).  

  

 

Assembling of the front-sheet metal 

1.

 

Assemble the sheet metal in front of the evaporator at 

the inside of the plastic water basin as shown.  

2.

 

To do this insert the sheet metal first at the right side 

between the plastic wall and the metal bracket of the 

evaporator (1.) 

3.

 

Move the sheet metal down (2.) and at the same time 

move it to the left (3.) until it fits in the yellow marked 

area. 

Caution! 

Before gluing check the correct orientation of the part 

(correct position of the cut out marked with the yellow 

arrow) and the positioning of the sealing tape. The 

gluing must be done carefully to ensure that the gaps 

are closed, and no water can splash through. 

 

 

 

 

Inside edges 

1.

 

2.

 

3.

 

Содержание SPX1200T

Страница 1: ...Sealing round cord length each 160mm 3 pcs Cable tie length 150mm 1 pcs Water barrier_front 1 pcs Water barrier_ back 10 pcs Fastening screws for fixation of outer housing not shown STEP 1 PREPARE TH...

Страница 2: ...he evaporator inlet and then unlocking the lid counterclockwise along the edge Loosen cable fixings 1 Carefully cut the marked cable ties Disassemble temperature sensor 1 Carefully remove the marked p...

Страница 3: ...bracket below the evaporator as shown 2 Apply one piece of the 13 cm long butyl round cord from below into the groove of the plastic support so that on each side approx 3 cm of this butyl round cord p...

Страница 4: ...nd press onto the edges where the butyl round cord is below of to seal this area 2 Bring back the evaporator to its original position and fix it with the two screws left and right Loosen the water hos...

Страница 5: ...e of the plastic water basin as shown 2 To do this insert the metal sheet first at the left side between the plastic wall and the metal bracket of the evaporator 1 3 To check Correct orientation of th...

Страница 6: ...edges of the sheet metal blue arrow Assembling of the front sheet metal 1 Assemble the sheet metal in front of the evaporator at the inside of the plastic water basin as shown 2 To do this insert the...

Страница 7: ...ing tape and glue it to the plastic and EPP part as shown at the left and the right side Caution Before gluing check the correct orientation of the part and the positioning of the sealing tape The glu...

Страница 8: ...of the right side with the last sealing tape Use 1 pcs of the 3 cm long sealing tapes to seal the gap between the sheet metal and the plastic wall at the right side of the sheet metal Caution Before...

Отзывы: