background image

4445103557 / 2021-08-05/ Page 7 of 8 

 

Sealing with the 2 protruding ends left and right 

1.

 

Glue the protruding ends of the butyl round cord to the 

sides of the sheet metal as shown to close the gap in 

this area between the sheet metal and the plastic water 

basin. 

Caution! 

Before gluing check the correct orientation of the part 

and the positioning of the sealing tape. The gluing must 

be done carefully to ensure that the gaps are closed, 

and no water can splash through.  

 

 

Sealing with the 2 pre-glued sealing tapes left and right 

1.

 

Press the sheet metal to the plastic wall, fold down the 

sealing tape and glue it to the plastic and EPP part as 

shown (at the left and the right side). 

Caution! 

Before gluing check the correct orientation of the part 

and the positioning of the sealing tape. The gluing must 

be done carefully to ensure that the gaps are closed, 

and no water can splash through. 

 

 

Sealing in the middle at the top 

1.

 

Glue one of the 13 cm long stripes of the sealing tape 

centered at the front of the sheet metal as shown. 

Position it at the edge of the bending (yellow arrow). 

2.

 

Press the sheet metal down to the plastic part, fold 

down the sealing tape and glue it to the plastic and EPP 

part as shown. 

Caution! 

Before gluing check the correct positioning of the 

sealing tape. The gluing must be done carefully to 

ensure that the gaps are closed, and no water can 

splash through. 

 

 

Содержание SPX1200T

Страница 1: ...Sealing round cord length each 160mm 3 pcs Cable tie length 150mm 1 pcs Water barrier_front 1 pcs Water barrier_ back 10 pcs Fastening screws for fixation of outer housing not shown STEP 1 PREPARE TH...

Страница 2: ...he evaporator inlet and then unlocking the lid counterclockwise along the edge Loosen cable fixings 1 Carefully cut the marked cable ties Disassemble temperature sensor 1 Carefully remove the marked p...

Страница 3: ...bracket below the evaporator as shown 2 Apply one piece of the 13 cm long butyl round cord from below into the groove of the plastic support so that on each side approx 3 cm of this butyl round cord p...

Страница 4: ...nd press onto the edges where the butyl round cord is below of to seal this area 2 Bring back the evaporator to its original position and fix it with the two screws left and right Loosen the water hos...

Страница 5: ...e of the plastic water basin as shown 2 To do this insert the metal sheet first at the left side between the plastic wall and the metal bracket of the evaporator 1 3 To check Correct orientation of th...

Страница 6: ...edges of the sheet metal blue arrow Assembling of the front sheet metal 1 Assemble the sheet metal in front of the evaporator at the inside of the plastic water basin as shown 2 To do this insert the...

Страница 7: ...ing tape and glue it to the plastic and EPP part as shown at the left and the right side Caution Before gluing check the correct orientation of the part and the positioning of the sealing tape The glu...

Страница 8: ...of the right side with the last sealing tape Use 1 pcs of the 3 cm long sealing tapes to seal the gap between the sheet metal and the plastic wall at the right side of the sheet metal Caution Before...

Отзывы: