
AZ motor
Edition 4
Instructions for bearings replacement
47
Step 28: Installing the terminal box and cable connection
You will need a TORX T20 screwdriver (a), a small flat screwdriver (g), wrench 19 mm (t)
and torque wrench (m) for this step.
Be careful not to damage motor wires, connector and connecting
cable.
Be careful not to damage terminal box seal.
MOTOR AZ 84
Disassemble motor from frame. Be careful not to hit the shaft.
Connect the connecting cable according to signs on cables and on motors (letters U, V and W
on cable must match U, V and W on motor). Use a small flat screwdriver (g) to press the pins
of connector.
Connect the ground ring connector and connect cable screen with cable clamp. Use TORX
T20 screwdriver (a). Tightening torque of screws is 2.5 Nm.
Install terminal box and tighten four M4 screws. Use TORX T20 screwdriver (a). Tightening
torque of screws is 2.5 Nm – PICTURE A.
Tighten the cable gland nut. Nut is tightened enough when the gap between cable gland nut
and the neighbour hexagonal part of cable gland is approximately 2 mm – PICTURE B. Use
wrench 19 mm (t).
Assemble the motor back to frame – PICTURE C.
Содержание AZ 108
Страница 1: ...AZ MOTOR INSTRUCTIONS FOR BEARINGS REPLACEMENT Edition 4 June 2014 ...
Страница 13: ...AZ motor Edition 4 Instructions for bearings replacement 13 2 3 2 Parts of motors AZ 108 AZ 150 AZ 220 ...
Страница 14: ...AZ motor Edition 4 Instructions for bearings replacement 14 Picture 4 Main motor parts AZ 108 AZ 150 AZ 220 ...