![DOM DOM Tapkey Access Manager V1 Скачать руководство пользователя страница 80](http://html1.mh-extra.com/html/dom/dom-tapkey-access-manager-v1/dom-tapkey-access-manager-v1_assembly-and-operating-instructions-manual_2517554080.webp)
Assembling the device
80
No.
Name
1
Transparent cover (detachable)
2
Front module / reading section (with safety screws)
3
Standard intermediate frame
4
Cover frame
5
Fixing screws
6
Back module / interface
7
Flush-mounted DIN device box (device screw spacing 60 mm)
8
Guide strips
9
Direct connector (pin)
10
Guide openings
11
Direct connector (socket)
12
"TOP" marking
Preparing installation
The respective wiring diagram is included in the scope of supply.
First route the connection cables required for interface, voltage supply and
for separate I/O box if necessary.
Observe and follow the generally valid VDE regulations.
Prepare the connection cables for connection.
Pull the front module carefully off the back module.
Set the front module down safely.
Check the setting of the DIP switches on the back module in accordance
with the respective interface and firmware function.
Make any necessary settings (configuration, address etc.).
Make sure no voltage is applied.
Connect the connection cables on the back according to the respective
wiring diagram.
Connecting RELINO/Gira to the Access Manager or Access Manager Terminal
(control unit)
The 7-pin terminal for the reader of
the ENiQ Module Reader of the
RELINO variant (flush-mounted
reader for installation in a socket or
light switch of a brand
manufacturer)