10
F
FORKLIFT CAPACITY
The figure shows the machine being lifted by a forklift
C-8056SA
5 T0N
4.2 INSTALLING THE MACHINE
4.2.1
Once the machine has been moved to the worksite, you need to make the machine leveling
adjustment using the leveling adjustment bolts and pads. Use the bracket in front of the vise
as a reference plane for leveling adjustments. Leveling accuracy is shown as below:
(a) The front side of the machine should be about 0,2 / 100mm lower than the backside.
(b) The movable vise should be about 0,2 / 100mm higher than the fix vise.
4.2.2
Once the machine has been properly installed, you then need to install the roller stand at the
backside of the machine. The height of roller is the same as bed.
4.2.3
Then fix the machine and roller stand to avoid their unexpected shifting.
4.3 CONNECTING THE POWER WIRES
4.3.1
The machine is coated with rust-preventative oil before shipment. You are requested to
thoroughly remove all rust-preventative oil before using the machine to avoid damaging the
machine parts during operation.
CAUTION: Use a mild cleanser to remove rust-preventative oil. Do not use volatile solvents
to remove rust-preventative oil such as benzene and gasoline.
Содержание C-8056SA
Страница 1: ...C 8056SA Metal Cutting Band Sawing Machine Version 20 8 2014 Utility Line Instruction Manual...
Страница 2: ......
Страница 3: ......
Страница 8: ...6 2 2 DIMENSIONAL DRAWINGS 2160 3220 3390 1600 DIMENSIONAL DRAWINGS OF THE C 8056SA...
Страница 22: ...20 6 4 LUBRICATION GREASE NIPPLE TENSIONING UNIT...
Страница 23: ...21 GREASE NIPPLE DRIVEN WHEEL GREASE NIPPLE SIDE GUARD OF GEAR BOX...
Страница 24: ...22 GREASE NIPPLE WORM BEARING IN GEARBOX...