16
Vertical Auger Stub Shaft Assemblies
UniDriv
1. Depending on your unit size, refer to Figures 4-6, 4-7, and 4-8 for the following steps.
Place unit up on the saw horses inside bin, with the center hanger bracket directly
under the center roof hatch and the outer drive directly under the side roof hatch. Anchor
with boards 8” long with holes drilled so that you can bolt the unit to the saw horses for
stability. The Outer Drive can be allowed to pivot to a natural resting position during
assembly. DO NOT INSTALL MAIN MOTOR UNTIL INSTRUCTED TO DO SO.
2. For your convenience the pulley, bearing, vertical drive spacers and sensing devices
have already been assembled to the stub augers, ready to bolt directly to the beam
brackets. The stub auger number should be affixed to the top of the topmost pulley of
each assembly. If for some reason the number has come off, compare the auger in
question with the other five (5) to determine which one it is.
3. The No. 4 Auger (see Figure 4-4) will always go to the outer drive side of the main motor
and the No. 5 Auger (see Figure 4-5) will always go to the center hanger side of the
main motor. These Assemblies contain the double 12"”cast motor belt pulleys.
4. The No. 2 (see Figure 4-2) and No. 3 Auger Assemblies (see Figure 4-3) contain the
Sensing Devices and are placed at either end of the beam. No. 2 Stub Auger Assembly
is used in the high belt position and the No.3 Stub Auger Assembly in used in the low
position. Check overall beam drawing for your particular unit length for correct position-
ing.
5. The No. 1 Stub Auger Assembly (see Figure 4-1) is the standard double 9” pulley as-
sembly. It is used on all units of 5 augers or more and is placed between the two Motor
Pulley Augers and the outside Sensing Device Augers.
6. Install the stub auger assemblies using the 3/8” x 1-1/4” bolts (S-2071), Nuts (S-456), Lock
Washers (S-1054), and Flat Washers (S-248). Loose assemble the stub shaft assem-
blies. Level the main beam from end to end, then use the level on the Stub Shaft Assem-
blies as they are tightened to ensure a 90-degree alignment to the beam. Also exact
spacing of the Stub Shaft Assemblies must be ensured. Check specification for your size
of unit and always measure from the end (first) Stub Auger Assembly. Start at one end and
work toward the other tightening bolts and lock collars as you go.
7. Slow Down Kit Option
a.
Assemble the stub shaft assembly with the 5” and 9” double pulley combination
next to the auger in the center of the bin. The 9” pulley should be assembled on the
top for the 24’, 27’, 42’ and 48’ size units. (See Figure 4-6) The 5” pulley should be
assembled on top for the 30’, 33’, and 36’ size units. (See Figure 4-7)
b.
Assemble the stub shaft assembly with the Slow Down, Speed Sensing device on
the beam in the center of the bin position.
Section 4 Vertical Auger Stub Shaft Assemblies
Содержание UniDriv
Страница 1: ...UniDriv OWNER S MANUAL PNEG 1161 PNEG 1161 Date 9 21 06...
Страница 2: ...2 UniDriv...
Страница 17: ...17 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 1 Stub Auger Assembly No 1 280001...
Страница 18: ...18 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 2 Stub Auger Assembly No 2 280002...
Страница 19: ...19 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 3 Stub Auger Assembly No 2VV 280002VV...
Страница 20: ...20 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 4 Stub Auger Assembly No 3 28000...
Страница 21: ...21 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 5 Stub Auger Assembly No 3 280003VV...
Страница 22: ...22 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 4 Stub Auger Assembly No 4 280004...
Страница 23: ...23 Vertical Auger Stub Shaft Assemblies UniDriv Figure 4 5 Stub Auger Assembly No 5 280005...
Страница 40: ...40 Harness Installation UniDriv Figure 9 1 Wiring Harness Figure 9 2 Outside Junction Box Location...
Страница 41: ...41 Harness Installation UniDriv Figure 9 3 Outside Junction Box Wiring Diagram...
Страница 42: ...42 Harness Installation UniDriv Figure 9 4 Middle Junction Box Wiring Diagram...
Страница 43: ...43 Harness Installation UniDriv Figure 9 5 230 VAC Single Phase Rotary Wiring Detail...
Страница 44: ...44 Harness Installation UniDriv Figure 9 6 230 VAC Three Phase Rotary Wiring Detail...
Страница 45: ...45 Harness Installation UniDriv Figure 9 7 460 VAC Three Phase Rotary Wiring Detail...
Страница 46: ...46 Harness Installation UniDriv Figure 9 8 230 VAC Single Phase Schematic...
Страница 47: ...47 Harness Installation UniDriv Figure 9 9 230 VAC Three Phase Schematic...
Страница 48: ...48 Harness Installation UniDriv Figure 9 10 460 VAC Three Phase Schematic...
Страница 57: ...57 UniDriv PARTS SECTION...
Страница 58: ...58 Track Parts UniDriv Track Parts S 277 S 1147 S 396 S 1054 S 7767 S 456 2FH5733 S 1147 S 396...
Страница 59: ...59 Outer Drive Parts UniDriv Figure 3 Frame Outer Drive Assembly Short...
Страница 61: ...61 Center Hanger Parts UniDriv Figure 3 1 Center Hanger to Bracket Detail 1 5 8 S 234 S 233 S 8981...
Страница 63: ...63 Center Hanger Parts UniDriv Figure 4 1 Stub Auger Assembly No 1 280001...
Страница 64: ...64 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 4 2 Stub Auger Assembly No 2 280002...
Страница 65: ...65 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 4 3 Stub Auger Assembly No 2VV 280002VV...
Страница 66: ...66 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 4 4 Stub Auger Assembly No 3 28000...
Страница 67: ...67 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 4 5 Stub Auger Assembly No 3 280003VV...
Страница 68: ...68 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 4 4 Stub Auger Assembly No 4 280004...
Страница 69: ...69 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 4 5 Stub Auger Assembly No 5 280005...
Страница 71: ...71 Vertical Auger Stub Shaft Assembly Parts UniDriv Figure 6 Stub Auger Assembly No 6 280006RP 30 33 36 Bins...
Страница 76: ...76 Harness Parts UniDriv 3 5 4 1 17 Figure 9 3 Outside Junction Box Wiring Diagram...