6 Setup page
15
When a time value is entered in the "All ON sequence delay" field, the power controller will pause for a period of time
before switching each outlet on in sequence. This delay helps prevent the power surges and blown circuit breakers
which can occur when multiple devices are switched on simultaneously. A delay of 60 seconds is suggested for
server applications. You may also enter a screen refresh delay in this section. If "Enable screen refresh" is checked,
and a delay value is entered, your browser should periodically update the status screen.
6.3
Power loss recovery modes
Power Loss Recovery Mode
When recovering after
power loss
Turn all Outlets off
Turn all Outlets on
Return to pre-powerloss state
Submit
Power loss recovery modes
The power loss recovery mode setting has three settings which take effect after a power failure:
1. You can turn all outlets off (all systems will be switched off until manually turned on later) by checking the first
box.
2. You can automatically turn all outlets on using the "All ON sequence delay" described above. Check the
second option to do this.
3. You can return to the same outlet settings that were used prior to the power loss. The "All ON sequence
delay" will also be used in this instance. Click the third option to return to pre-powerless state.
6.4
User-defined links
User Defined Links
#
URL
Description
1
http://www.digital-loggers.com/
Digital Loggers, Inc.
2
/src.tar.gz
Source code
Submit
User-defined links
You may link to other power controllers, your own web pages, or remote web sites by entering up to four URLs and
descriptions in the Setup page. For example, enter "Site Two Power Controller" in the description field with a URL
of "http://192.168.0.250/". These links appear on every page of the main web UI.
DLI LPC9 User’s Guide: 1.7.24.0
Содержание LPC9
Страница 1: ...DLI LPC9 User s Guide 1 7 24 0 ...
Страница 81: ......