AGRAS MG-1 User Manual
© 2016 DJI. All Rights Reserved.
5
Unfolding the Frame Arms
1. Unfold the frame arms totally
. Tighten each sleeve at the eight junctions
.
2. Double check the positions of the frame arms. Frame arms M1 and M2 form the front of the aircraft, while frame
arms M5 and M6 form its rear. Seen from the top, motors on frame arms M1, M3 and M5 should rotate counter
clockwise, while motors on frame arms M2, M4 and M6 should rotate clockwise.
Mounting the Sprinklers
1.
The e a e sp i kle ou ti g positio s o the otto of the fou oto s o the ai aft’s left
and right side
(motors on frame arms M3, M4, M7 and M8). Tighten the two M3x6 screws to mount the sprinklers.
Motor Port
Motor Cable
Содержание AGRAS MG-1
Страница 1: ...AGRAS MG 1 User Manual V1 0 2016 02...