7
4HENTHEENTIREENDSTRUCTURETWOCOLUMNSANDCROSSBEAM WILLNEEDTOBESTOODUPASONE
5NPACKTHE,OCK,ADDERS)TEM &IGUREFROMTHEPACKAGEANDSLIDETHEMINTOTHEPRECUTSLOTON
THE2UB"LOCKS)TEM &IGUREINSIDEEACHCOLUMN!FTERREMOVINGTHETOPNUTFROMTHELOCK
LADDERYOUAREREADYTOINSTALLTHE4OP#APS!")TEMS &IGURESONTHECOLUMNS
"EAWAREOFTHEOFFSETHOLEINCOLUMN4OP#APS!RRANGETHEMSOTHATTHECABLEMOUNTINGHOLESARECLOS
ESTTOTHERUNWAYS5SEPROVIDEDBOLTSNUTSWASHERSANDLOCKWASHERSTOINSTALL4OP#APSASSHOWNIN
&IGURE
3ECURE4OP#APAND,OCK,ADDERASSEMBLIESTOGETHERWITH7ASHERAND.UT)TEMS &IGURE
Position the Crossbeams at the second lowest locking position on all columns.
3TANDUPANDARRANGETHETWOENDSTRUCTURES#OLUMNS#ROSSBEAMS SOTHATTHEOUTSIDEOFTHE#ROSS
beam rail to the outside of the other Crossbeam rail measure's 184.5”. Compare the measurements from
THELEFTANDTHERIGHTUNTILTHEYAREDIAGONALLYWITHINv4HEvVARIANCEWILLHELPINMOUNTING
the runways later.
,IFTANDPOSITIONEACH2UNWAYINTOPLACEANDSECUREWITHTHEPROVIDED(EX"OLTS,OCK7ASHER&LAT
7ASHERAND.UT)TEMS ASSHOWNIN
&IGURE4HELIFTWILLSQUAREITSELFASYOUFURTHERASSEMBLEIT
.OTE)NSTALLTHE/FFSIDE2UNWAY)TEM OPPOSITEFROMTHE-AINSIDE2UNWAY)TEM AND0OWERUNIT
#OLUMNASSHOWNIN&IGURE
"EGINCABLEROUTINGINSTALLATIONBYREMOVINGTHE#ABLE3HEAVES3HAFTSAND3PACERSFROMALLFOURCORNERS
OFTHE-AINSIDE2UNWAYASSHOWNIN&IGURE
2OUTEANDMOUNTTHEAPPROPRIATE#ABLES )TEMS TOEACH#OLUMN4OP#APWHILEENSUR
INGTHATTHE0LASTIC#ABLE0ULLEY)TEM ISBETWEENTHE#ABLEANDTHE,OCK,ADDERASSHOWNIN
&IGURES4HISWILLALLOWTHESECONDARYSLACKCABLELOCKTOFUNCTIONPROPERLY3EE&IGURE
for Cable routing installation.
14.
Reinstall the Cable Sheaves, Shafts, Spacers and hardware as shown in
&IGURES
.OTE-AKESUREALL#ABLESAREPROPERLYROUTEDAROUND#ABLE3HEAVES
)NSTALLALL,OCK2ODS,INKAGECOMPONENTSPERTHEDRAWINGON0AGE &IGURE!LSOINSTALLTHE
#ROSSBEAM"RACKET)TEM TOMIDDLEOUTSIDEOFEACH#ROSSBEAM3ECUREWITHTHEPROVIDED(ARD
WARE)TEMS &IGURE
-OUNTTHE0OWER5NIT)TEM TOTHE-AINSIDE#OLUMNWITHTHEATTACHEDMOUNTINGBRACKETUSINGTHE
(ARDWARE)TEMS PROVIDEDASSHOWNIN&IGURE/NCEMOUNTEDlLLTHE0OWER
5NITRESERVOIRTANKWITHHYDRAULICmUID.OWINSTALLTHEDEGREE(YDRAULIC&ITTING)TEM &IGURE
TOTHEHIGHPRESSUREPORTONTHE0OWER5NIT#ONNECTTHEELECTRICALPOWERTOTHE0OWER5NIT
)NSTALLTHEhBRADEDv(YDRAULIC(OSE)TEM TOTHE&ITTINGONTHESIDEOFTHE-AINSIDE2UNWAYANDAT
TACHTHEOTHERENDTOTHEDEGREE&ITTINGONTHE0OWER5NITASSHOWNIN&IGURE
.OWRAISETHECOMPLETEUNIT,IFT ANDSETATONEOFTHEBOTTOMLOCKPOSITIONS0LACELEVELONCROSSBEAM
4IGHTEN,OCK,ADDER2OD.UTLOCATEDONTHETOPOFEACHPOSTS)TEM 4HISWILLRAISETHECORNEROFTHE
Содержание PP9 Plus
Страница 5: ...5...
Страница 12: ...12 s 0ULL SAFETY LATCH RELEASES AND PRESS THE LOWER LEVER TO BEGIN DESCENT...
Страница 27: ...27 43 32 33 38 1 33 42 39 44 40 41 i Lower lift and remove vehicle...
Страница 30: ...30 A A...
Страница 31: ...31 When making changes to adjustment nuts on cable end or latch bar stud always leave at least two threads...
Страница 32: ...32 showing between nut and stud end 72 40 68 47 69 58 73 71 70...