background image

29

85

86

90

90

84

91

54

87

92

88

93

88

89

89

89

92

30

90

87

86

85

86

84

87

A

UMNBYADJUSTINGTHEIRCABLESSOALLFOURLATCHESCLICKATSAMETIME

4IGHTENJAMNUTS

Содержание PP9 Plus

Страница 1: ...tion be sure to return documents to package and give all materials to lift owner operator When installation is complete be sure to run lift up and down a few cycles with and without typical vehicle lo...

Страница 2: ...CONTENTS s 0 24 4 2 4 pg 2 s 4 3 2 15 2 pg 4 s 4 30 4 3 pg 4 s LOOR 0LAN pg 5 s 34 4 3425 4 3 pg 6 s 34 2 4 33 9 34 4 pg 8 s 5 4 2 2 15 2 43 pg 9 s 7 2 0 9 2 2 30 3 49 pg 13 s 54 4 54 pg 13 s 3 49 02...

Страница 3: ...ting lift EEP THIS MANUAL NEAR LIFT AT ALL TIMES AKE SURE ALL OPERATORS READ THIS MANUAL 4 RE YOU INSTALLING IN A LEVEL LOCATION IFT MUST BE ANCHORED IN PLACE IF SLOPE IS GREATER THAN 1 8 per foot AKE...

Страница 4: ...OTHER PROPOSED APPLICATION OF THIS EQUIPMENT SHOULD BE DOCUMENTED AND SUBMITTED IN WRITING TO THE FACTORY FOR EXAMINATION 4HE USER ASSUMES FULL RESPONSIBILITY FOR ANY EQUIPMENT DAMAGE PERSONAL INJURY...

Страница 5: ...5...

Страница 6: ...IGURE ON THE END OF THE CYLINDER OW UNBOLT THE TOP RUNWAY TAKING THE NECESSARY SAFETY PRECAUTIONS OTE 5SING SOME TYPE OF A HOIST IS RECOMMENDED THIS RUNWAY WILL NEED TO BE mIPPED OVER SO IT IS NO LONG...

Страница 7: ...UMN AS SHOWN IN IGURE EGIN CABLE ROUTING INSTALLATION BY REMOVING THE ABLE 3HEAVES 3HAFTS AND 3PACERS FROM ALL FOUR CORNERS OF THE AINSIDE 2UNWAY AS SHOWN IN IGURE 2OUTE AND MOUNT THE APPROPRIATE ABLE...

Страница 8: ...RTING THE LIFT DJUST THE ABLE YLON OCK UT TEM LO CATED ON THE TOP OF EACH POST UNTIL LIFT IS LEVEL ON CROSSBEAMS AND RUNWAYS 4HIS WILL ENSURE THE LIFT TRAVELS up and down level 4 9 5 9 4 53 0 23 4 4 2...

Страница 9: ...ENTS Concrete shall have compression strength of at least 3 000 PSI and a minimum thickness of 4 CAUTION 4 USE ON ASPHALT OR SIMILAR UNSTABLE SURFACES 30 4 4HIS IFT DOES NOT REQUIRE BOLTING TO THE mOO...

Страница 10: ...ION TORQUE REPLACE THE CONCRETE UNDER EACH COLUMN BASE WITH A X X v THICK 03 MINIMUM CONCRETE PAD KEYED UNDER AND mUSH WITH THE TOP OF EXISTING mOOR LLOW CONCRETE TO CURE BEFORE INSTALLING LIFTS AND A...

Страница 11: ...s EEP HANDS AND FEET AWAY FROM PINCH POINTS AT ALL TIMES s EVER OVERRIDE THE LIFT OPERATING AND SAFETY CONTROLS s F A VEHICLE IS SUSPECTED OF FALLING CLEAR AREA IMMEDIATELY s O NOT ROCK VEHICLE WHILE...

Страница 12: ...12 s 0ULL SAFETY LATCH RELEASES AND PRESS THE LOWER LEVER TO BEGIN DESCENT...

Страница 13: ...SURE THAT LIFT INSPECTORS ARE QUALIlED AND THAT THEY ARE ADEQUATELY TRAINED IN THE INSPECTION OF THE LIFT s 3HALL ESTABLISH PROCEDURES TO PERIODICALLY MAINTAIN THE LIFT IN ACCORDANCE WITH THE LIFT MAN...

Страница 14: ...t 5NLOAD THE SUBJECT LIFT 3HUT IT DOWN AND ASSURE THE DISCONNECT SWITCH IS h v IF ONE IS PROVIDED ON THE lift 4HE AUTHORIZED LOCKOUT PERSON OPERATES THE MAIN ENERGY ISOLATION DEVICE REMOVING POWER TO...

Страница 15: ...PERATING INTERNAL COMBUSTION ENGINES EEP HAIR LOOSE CLOTHING lNGERS AND ALL PARTS OF BODY AWAY FROM MOVING PARTS 4O REDUCE THE RISK OF ELECTRIC SHOCK DO NOT USE ON WET SURFACES OR EXPOSE TO RAIN 5SE O...

Страница 16: ...FACTURER 7 2 CCUPATIONAL 3AFETY AND EALTH DMINISTRATION 3 AND THE MERICAN ATIONAL 3TANDARDS NSTITUTE 3 REQUIRES USERS TO INSPECT LIFTING EQUIPMENT AT THE START OF EVERY SHIFT 4HESE AND OTHER PERIODIC...

Страница 17: ...LE SHEAVES ASSEMBLY FOR FREE MOVEMENT OR EXCESSIVE WEAR ON CABLE SHEAVE SHAFT Yearly Maintenance s UBRICATE THE CABLE SHEAVE SHAFT BY USING GREASE GUN AT LEASE ONCE A YEAR AFTER THE LIFT IS IN SERVICE...

Страница 18: ...MS THAT MAY BE ENCOUNTERED AND THEIR PROBABLE CAUSES ARE COVERED IN THE FOLLOWING PARA GRAPHS s Motor Does Not Operate AILURE OF THE MOTOR TO OPERATE IS NORMALLY CAUSED BY ONE OF THE FOLLOWING REAKER...

Страница 19: ...otor Hums and Will Not Run F THE MOTOR HUMS BUT FAILS TO RUN TAKE THE FOLLOWING ACTIONS IFT OVERLOADED 2EMOVE EXCESSIVE WEIGHT FROM LIFT 7 2 4HE VOLTAGES USED IN THE LIFT CAN CAUSE DEATH OR INJURY TO...

Страница 20: ...SE FROM THE LIFT IS NORMALLY CAUSED BY THE FOLLOWING 1 Cross beam ends are rubbing the columns Readjustment needed 2 Cylinder too tight load lift half capacity and cycle up and down a few times to bre...

Страница 21: ...CES DURING LIFT operation to ensure that latches work properly and line up with slots in latch plate located in columns Monthly Inspection Maintenance 1 Cables 1 1 Clean wire rope cables with lift in...

Страница 22: ...in both lowered and raised position by spraying with Penetrating Oil and wiping the cable down 1 2 Adjust cables using procedures on following pages 3LACK ABLE EVICE NSPECT SLACK CABLE DEVICES USING P...

Страница 23: ...AYS 3HEAVES ARE EXPENDABLE ITEMS 3HEAVES AND PINS SHOULD BE REPLACED WHEN WORN 5SE OF SHEAVES AND PINS WITH EXCESSIVE WEAR WILL LEAD TO REDUCED SERVICE LIFE OF CABLES NSPECT SHEAVES PULLEYS IN YOKE EN...

Страница 24: ...draulic hoses for leaks 2EPAIR OR REPLACE AS REQUIRED 1 Check and tighten the hydraulic cylinder rod nuts holding the cable pull bar 42 3 FOR 2OLLING ACK AND IL RAIN 0AN NSPECT ROLLING JACK OIL DRAIN...

Страница 25: ...line up with slots in latch bar located in all four columns Cable Adjustment 1 Initial Adjustment Adjust cable with lift fully lowered Loosen jam nut and tighten nut on cable stud on top of column unt...

Страница 26: ...H F ENTIRE v CLEARANCE CANNOT BE ATTAINED BY ADJUSTING THE LOCKING LATCH BAR ADJUST THE CABLE 4URN CABLE ADJUSTING NUT TO RAISE THE LOCKING LATCH v ABOVE BOTTOM OF LATCH BAR SLOT 4IGHTEN CABLE JAM NU...

Страница 27: ...27 43 32 33 38 1 33 42 39 44 40 41 i Lower lift and remove vehicle...

Страница 28: ...28 J 2AISE THE LIFT TO FULL HEIGHT 34 AND 7 4 as the first locking latch clicks into place Synchronize the other three columns with this col...

Страница 29: ...29 85 86 90 90 84 91 54 87 92 88 93 88 89 89 89 92 30 90 87 86 85 86 84 87 A UMN BY ADJUSTING THEIR CABLES SO ALL FOUR LATCHES CLICK AT SAME TIME 4IGHTEN JAM NUTS...

Страница 30: ...30 A A...

Страница 31: ...31 When making changes to adjustment nuts on cable end or latch bar stud always leave at least two threads...

Страница 32: ...32 showing between nut and stud end 72 40 68 47 69 58 73 71 70...

Страница 33: ...2 0 4 10 44 2 0 4 11 54 16 12 7 3 2 16 13 4 7 3 2 32 14 4 16 15 0 952 4 34 2 7 v v 4 16 4 4 17 4 7 3 2 56 18 7 3 2 20 19 54 8 20 3 h 2 6 v 2 0 2 21 3 4 2 4 22 3 6 2 0 4 3 23 3 4 0 4 1 24 3 6 2 0 4 1 2...

Страница 34: ...3 3 6 3 4 4 61 4 4 62 3 2 6 2 3 25 7 9 3 7 4 1 63 53 30 2 4 64 53 30 2 2 65 3 25 7 9 3 6 3 4 4 66 4 0 4 4 67 4 8 68 3 v v 1 69 3 v v 1 70 3 v v 1 71 3 v v 1 72 v 9 54 v 4 73 9 9 2 5 9 2 1 74 7 9 2 5...

Страница 35: ...2 2 99 3 2 7 2 100 2 4 1 101 544 2 102 3 2 7 4 103 30400 1999 7 3 2 4 104 3 4 2 44 1 105 0 2 Wheel Chock 2 106 0 2 Angle Iron 2 107 0 2 Rubber 8 108 ISCAL EAD 3CREW 8 109 LAT 7ASHER 8 110 UT 8 Accesso...

Страница 36: ...You may contact us by one of the following By Standard Mail Direct Lift 996 Industrial Drive MADISON IN 47250 UNITED STATES Email sales directlift com Phone 866 347 5438 Fax 812 273 7315...

Отзывы: