14
4HISPROCEDUREESTABLISHESTHEMINIMUMREQUIREMENTSFORTHELOCKOUTOFENERGYTHATCOULDCAUSEINJURYTOPER
-
sonnel by the operation of lifts in need of repair or being serviced. All employees shall comply with this proce-
dure.
Responsibility
4HERESPONSIBILITYFORASSURINGTHATTHISPROCEDUREISFOLLOWEDISBINDINGUPONALLEMPLOYEESANDSERVICEPERSON
-
NELFROMOUTSIDESERVICECOMPANIESIE!UTHORIZED)NSTALLERSCONTACTORSETC !LLEMPLOYEESSHALLBEINSTRUCT
-
ed in the safety significance of the lockout procedure by the facility owner/manager. Each new or transferred
EMPLOYEEALONGWITHVISITINGOUTSIDESERVICEPERSONNELSHALLBEINSTRUCTEDBYTHEOWNERMANAGERORASSIGNED
designee) in the purpose and use of the lockout procedure.
Preparation
%MPLOYEESAUTHORIZEDTOPERFORMLOCKOUTSHALLENSURETHATTHEAPPROPRIATEENERGYISOLATINGDEVICEIECIRCUIT
BREAKERFUSEDISCONNECTETC ISIDENTIlEDFORTHELIFTBEINGLOCKEDOUT/THERSUCHDEVICESFOROTHEREQUIPMENT
MAYBELOCATEDINCLOSEPROXIMITYOFTHEAPPROPRIATEENERGYISOLATINGDEVICE)FTHEIDENTITYOFTHEDEVICEISIN
QUESTIONSEETHESHOPSUPERVISORFORRESOLUTION!SSURETHATPROPERAUTHORIZATIONISRECEIVEDPRIORTOPERFORMING
the lockout procedure.
Sequence of Lockout Procedure
1)
Notify all affected employees that a lockout is being performed and the reason for it.
5NLOADTHESUBJECTLIFT3HUTITDOWNANDASSURETHEDISCONNECTSWITCHISh/&&vIFONEISPROVIDEDONTHE
lift.
4HEAUTHORIZEDLOCKOUTPERSONOPERATESTHEMAINENERGYISOLATIONDEVICEREMOVINGPOWERTOTHESUBJECT
lift.
s
)FTHISISALOCKABLEDEVICETHEAUTHORIZEDLOCKOUTPERSONPLACESTHEASSIGNEDPADLOCKONTHEDEVICETO
PREVENTITSUNINTENTIONALREACTIVATION!NAPPROPRIATETAGISAPPLIEDSTATINGTHEPERSONSNAMEATLEASTv
XvINSIZEANEASILYNOTICEABLYCOLORANDSTATESNOTTOOPERATEDEVICEORREMOVETAG
s
)FTHISDEVICEISANONLOCKABLECIRCUITBREAKERORFUSEREPLACEWITHAhDUMMYvDEVICEANDTAGITAPPRO
priately as mentioned above.
!TTEMPTTOOPERATELIFTTOASSURETHELOCKOUTISWORKING"ESURETORETURNANYSWITCHESTOTHEh/&&vPOSI
tion.
4HEEQUIPMENTISNOWLOCKEDOUTANDREADYFORTHEREQUIREDMAINTENANCEORSERVICE
Restoring Equipment to Service
1)
Assure the work on the lift is complete and the area is clear of tools, vehicles, and personnel.
!TTHISPOINTTHEAUTHORIZEDPERSONCANREMOVETHELOCKORDUMMYCIRCUITBREAKERORFUSE TAGAND
activate the energy isolating device so that the lift may again be placed into operation.
Rules for Using Lockout Procedure
5SETHE,OCKOUT0ROCEDUREWHENEVERTHELIFTISBEINGREPAIREDORSERVICEDWAITINGFORREPAIRWHENCURRENT
operation could cause possible injury to personnel, or for any other situation when unintentional operation could
injure personnel. No attempt shall be made to operate the lift when the energy isolating device is locked out.
Operating Conditions
Содержание PP9 Plus
Страница 5: ...5...
Страница 12: ...12 s 0ULL SAFETY LATCH RELEASES AND PRESS THE LOWER LEVER TO BEGIN DESCENT...
Страница 27: ...27 43 32 33 38 1 33 42 39 44 40 41 i Lower lift and remove vehicle...
Страница 30: ...30 A A...
Страница 31: ...31 When making changes to adjustment nuts on cable end or latch bar stud always leave at least two threads...
Страница 32: ...32 showing between nut and stud end 72 40 68 47 69 58 73 71 70...