9
CASTER KIT INSTALLATION
1.
Raise the Lift two to four feet high
0OSITIONEACHOFTHEFOUR#ASTERASSEMBLIESBELOWTHE#ROSSBEAMRAILSASSHOWNONPAGE&IGURE
and in below diagram.
3.
Install the four Pivot pins and Cotter pins to secure assembly to each column as shown below.
4.
Lower the Lift confirming that the Caster assemblies engage the Crossbeam rails and the four Columns
RISETOCLEARTHEmOOR
FOUNDATION REQUIREMENTS
Concrete shall have compression strength of at least 3,000 PSI and a minimum thickness of 4”.
CAUTION!
$/./4USEONASPHALTORSIMILARUNSTABLESURFACES
30%#)!,./4%
4HIS,IFTDOESNOTREQUIREBOLTINGTOTHEmOOR
"54
)FYOUCHOOSETHEOPTIONTOANCHORTHE,IFTTOTHEmOORPLEASEFOLLOWTHEDETAILEDINSTRUCTIONSANDCRITERIABELOW
FOUNDATION and ANCHORING REQUIREMENTS
1.
Concrete shall have compression strength of at least 3,000 PSI and a minimum thickness of 4” in order
TOACHIEVEAMINIMUMANCHOREMBEDMENTOFv./4%7HENUSINGvXv LONGANCHORSIFTHETOP
OFTHEANCHOREXCEEDSvABOVETHEmOORGRADEYOU$/./4HAVEENOUGHEMBEDMENT
Содержание PP9 Plus
Страница 5: ...5...
Страница 12: ...12 s 0ULL SAFETY LATCH RELEASES AND PRESS THE LOWER LEVER TO BEGIN DESCENT...
Страница 27: ...27 43 32 33 38 1 33 42 39 44 40 41 i Lower lift and remove vehicle...
Страница 30: ...30 A A...
Страница 31: ...31 When making changes to adjustment nuts on cable end or latch bar stud always leave at least two threads...
Страница 32: ...32 showing between nut and stud end 72 40 68 47 69 58 73 71 70...