Doc. 031856-03 12/06
1
1 • Unpacking the ICS-90 System
This manual provides instructions for the initial installation of the ICS-90 Ion
Chromatography System (ICS-90). Follow these installation instructions step-by-
step, in the order specified.
A newer version of the ICS-90, called the ICS-90A, has a feature that allows the
approximate flow rate to be displayed in Chromeleon
®
Chromatography
Management System or Chromeleon Xpress. Unless otherwise specified, all of the
information in this manual applies to both the ICS-90 and the ICS-90A. If you are
unsure which system you have, check the model data label on the rear panel.
It is especially important to install Chromeleon or Chromeleon Xpress
before connecting the USB cable from the computer to the ICS-90 and
before turning on the ICS-90 power.
1.1
Facility Requirements
•
Make sure the ICS-90 installation site meets the following environmental
specifications:
Operating Temperature:
10 to 35 °C (50 to 95 °F)
Humidity:
5% to 95% relative humidity, noncondensing
•
The ICS-90 requires a sturdy workbench of a height that ensures convenient
access to the interior.
•
Allow at least 15 cm (6 in) behind the ICS-90 for power connections and
ventilation. For optimal performance, install the ICS-90 in a draft-free
location, out of the path of air conditioning and heating vents.
•
A clean gas source regulated to between 0.55 and 0.83 MPa (80 and 120 psi)
is required for pressurization of the eluent reservoir.
•
Use ASTM filtered, Type I (18-megohm) deionized water when preparing
eluent and regenerant.