© Diamond Mowers®, LLC
The carrier must be equipped with a
case drain and be rated for the hydraulic
flow and lift capacity listed below.
The motor has been factory tuned to
match the GPM and PSI settings on the
tag (#10) at left. To maintain warranty
coverage, your Diamond Dealer can
fine-tune or adjust these settings
and update the GPM and PSI tag. For
attachments that are outside of the
warranty period, follow the
Motor
Calibration
instructions below:
Motor Calibration:
•
Remove the motor side top
access cover
(1)
.
•
Temporarily remove the plug
(2)
marked “G” from the motor and
install the adapter
(3)
, hose
(4)
, and
5000PSI (345Bar) rated gauge
(5)
.
◦
Use teflon tape on pipe threads.
◦
Adapter
(3)
, hose
(4)
, and 5000PSI
(345Bar) rated gauge
(5)
are from
Diamond kit part #44-0949.
•
Place the gauge
(5)
in a location so
the dial and markings are clearly
visible to the operator.
INSTALLATION
MACHINE REQUIREMENTS
DECK
GPM (LPM)
LBS (KG)
60” (1524mm)
27-31 (102-118)
2300 (1044)
60” (1524mm)
32-45 (122-171)
2300 (1044)
72” (1829mm)
32-45 (122-171)
3190 (1447)
CONTINUED ON NEXT PAGE
Keep away from the spinning drum
when operating the unit; serious
injury or death can result from
contact with the drum.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
10
Содержание Drum Mulcher OD Pro X
Страница 1: ...DIAMONDMOWERS COM OPERATOR S MANUAL...
Страница 42: ...This Page Is Intentionally Left Blank...
Страница 43: ...This Page Is Intentionally Left Blank...
Страница 44: ...DIAMONDMOWERS COM DIAMONDMOWERS COM 15 1199 ODS MANUAL 211111...