background image

JINDLU04 Rev G 21/04/16 

4.

 

Release the door catch and hold the 
door ajar. 

5.

 

Offer the Door Fascia into position, 
passing the 3x M6 studs through the 
holes in the door and fix in position 
using the nuts and washers provided. 

 

6.

 

Close the door and check the 
alignment of the Door Fascia with the 
frame. Adjust as necessary.  

7.

 

Attach the door handle to the door 
lever using the M6 screws and 
washers. Check the alignment of the 
handle with the door fascia and adjust 
as necessary. 

The door handle should 

be flush with the fascia and have an 
even gap around it when in the 
closed position.

 

 

 
 
C

OMMISSIONING

 

Upon completion of the installation allow a 
suitable period of time for any fire cement 
and mortar to dry out. A small fire may then 
be lit and the installation checked to ensure 
the smoke and fumes are drawn up the flue 
and emitted safely to atmosphere. The stove 
should not be run at full output for at least 24 
hours. 

Read the Operating Instructions 

before lighting the stove for the first time. 

 

 
Leave the instructions and operating tool(s) 
with the customer and advise them on -  
 

 

Correct use of the appliance 

 

The recommended fuel 

 

Action to be taken should smoke or 
fumes be emitted from the stove or 
installation. 

 

The use of a fireguard when the stove 
is used in the presence of children or 
the infirm. 

 

 

Содержание CVSDL04-FP3BLK

Страница 1: ...JINDLU04 Rev G 21 04 16 Wood Burning Inset Stove Installation and Operating Instructions CVSDL04 FP3BLK CVSDL04 FP4BLK CVSDL04FP3PWT CVSDL04 FP4PWT R4...

Страница 2: ...s Park Exeter United Kingdom EX1 3QS DSEN13229 Inset Wood Burning Stove Appliance Mass 70kg Efficiency 79 Nominal Heat Output 4 9kW Mean Co Emission 13 O2 0 09 Mean OGC Emission 13 O2 99 mg m3 n Mean...

Страница 3: ...ons scheme it is a legal requirement in the UK to notify your local building control body in advance of any work starting HEALTH AND SAFETY PRECAUTIONS Special care must be taken when installing the s...

Страница 4: ...stent fume emission must not be tolerated This appliance should not be operated with the doors open If fume emission does persist then the following action should be taken immediately Open Doors and w...

Страница 5: ...terials The dimensions of the opening should be at least those shown in the diagram Ensure there is a sufficient overlap where the convection chamber flange meets the face of the opening If not either...

Страница 6: ...the kit before proceeding HEARTH REQUIREMENTS A constructional hearth with a minimum thickness of 125mm should be provided The constructional hearth should be made of solid non combustible material an...

Страница 7: ...cordance with Building Regulations Approved Document J or a twin walled insulated stainless steel flue to BS EN 1856 can be used These chimneys must be fitted in accordance with the manufacturer s ins...

Страница 8: ...xings and the flue outlet as well as protect the internal components from damage during the installation process 1 To open the stove door press on the door lever to release it from the latch Swing the...

Страница 9: ...s into the centre and remove them from the stove 5 Remove the three rear brick sections noting their positions and orientation 6 Lift up and remove the base brick 7 Remove the Air Valve Cassette by re...

Страница 10: ...ce 2 Drill a 6mm hole into the hearth in the centre of the base plate fixing hole Use the screw supplied to fix the stove in place Any voids around the stove must be In filled with vermiculite concret...

Страница 11: ...hen filled and sealed once the installation is complete Alternatively a connection can be made using a register plate although it will be necessary to allow access for fitting the flue pipe to the reg...

Страница 12: ...d it when in the closed position COMMISSIONING Upon completion of the installation allow a suitable period of time for any fire cement and mortar to dry out A small fire may then be lit and the instal...

Страница 13: ...or unseasoned wood will create tar deposits in the stove and chimney increase harmful emissions and will not produce a satisfactory heat output Do not burn waste mineral fuel or treated or painted woo...

Страница 14: ...he stove door Once the kindling is well alight open the door and build the fire by gradually adding slightly larger pieces of wood closing the door afterwards Once the fire is established close the Ig...

Страница 15: ...can be replaced with new available from your dealer Air Valve Cassette this should be removed and cleaned monthly to remove any ash that may be in the controls N B Make sure that controls are in the...

Страница 16: ...t may therefore be necessary to adjust the door catch to maintain the door seal To adjust the catch slacken the two set screws on the catch bar and adjust the position of the catch bar as necessary Ai...

Страница 17: ...JINDLU04 Rev G 21 04 16 Stove Spares BODY SPARES...

Страница 18: ...JINDLU04 Rev G 21 04 16 Stove Spares DOOR SPARES...

Страница 19: ...JINDLU04 Rev G 21 04 16 Stove Spares AIR VALVE CASSETTE SPARES...

Отзывы: