Check that the appliance power switch is in the
ON position. The test will automatically proceed
if the appliance power switch is placed in the
ON position.
•
If the
LO LOAd
enunciator remains on the
display, the load presented by the appliance
may be too small for the DLPT2+ to detect. In
this case, press the CLI test key to continue.
•
If the Insulation Resistance is greater than the
factory set limit a tick is placed next to the
Riso
enunciator. If the Insulation Resistance is less
than the set limit a cross is placed next to the
Riso
enunciator, the
FAIL
enunciator is
displayed and the test sequence is halted.
Note
:
If a mains supply is detected, the DLPT2+
will perform a differential leakage test.
If the DLPT2+ does not detect a mains
supply then the DLPT2+ will perform a
substitute leakage test.
•
If a substitute leakage test is performed then the
DLPT2+ will start the test without the need for
user intervention. If the substitute leakage is less
than the factory set limit a tick is placed next to
the
Iea
enunciator.
Содержание DLPT2+
Страница 1: ......
Страница 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Страница 10: ...DLPT2 Operating Instructions 10 Figure 2 DLPT2 End View Figure 3 Testing CLI appliances no mains leakage ...
Страница 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Страница 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Страница 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Страница 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Страница 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Страница 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...