DLPT2+
Operating Instructions
32
Whenever reSet is displayed on the LCD press the
reset button on the RCD.
The DLPT2+ will perform a I
Δ
n (30mA) 0
o
test, the
operating time of the RCD will be shown on the
DLPT2+ LCD. If the test passes then the DLPT2+
will perform a I
Δ
n (30mA) 180
o
test. As long as the
tests continue to pass the DLPT2+ will continue to
test both 0
o
and 180
o
at I
Δ
n (30mA).
3.9
Performing an RCD test on a Plug top RCD
The DLPT2+ can be used to measure the operating
time of a plug top RCD.
When plugging the mains lead into the
DLPT2+ plus ensure that the polarity
orientation of the connector is correct. DO
NOT FORCE THE PLUG INTO THE
CONNECTOR. Doing so may damage the
DLPT2+.
When performing an RCD test ensure that
the Continuity Test probe is disconnected
from the DLPT2+
Connect the DLPT2+ mains lead to the mains inlet
socket of the DLPT2+ and a mains outlet.
Plug the RCD into the DLPT2+. Plug the supplied
IEC lead into the RCD and the DLPT2+ IEC socket.
To test the RCD operating time press the 30mA
RCD test key.
The mains supply status is checked and the status
is indicated using the LN, LE and NE enunciators of
the LCD.
Содержание DLPT2+
Страница 1: ......
Страница 9: ...DLPT2 Operating Instructions 9 Figure 1 DLPT2 Front View ...
Страница 10: ...DLPT2 Operating Instructions 10 Figure 2 DLPT2 End View Figure 3 Testing CLI appliances no mains leakage ...
Страница 11: ...DLPT2 Operating Instructions 11 Figure 4 Testing CLII appliances no mains leakage ...
Страница 12: ...DLPT2 Operating Instructions 12 Figure 5 Testing CLI appliances mains leakage ...
Страница 13: ...DLPT2 Operating Instructions 13 Figure 6 Testing CLII appliances mains leakage ...
Страница 14: ...DLPT2 Operating Instructions 14 Figure 7 Testing IEC Leads ...
Страница 15: ...DLPT2 Operating Instructions 15 Figure 8 Testing Installation RCD ...
Страница 16: ...DLPT2 Operating Instructions 16 Figure 9 Testing Plug Top RCD ...