S Series Shelter
Operation & Maintenance
95310-02
3-4
DHS Systems, LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may
be reproduced for release to a third party without written consent from DHS Systems LLC
.
030.01 Loading the Shelter for Transport
When loading the Shelter onto any platform, lift and slide the
entire package so that Shelter remains parallel with the
ground.
Note: do not rock the shelter when on-loading. This may
cause damage to the struts.
Refer to Figure 3-8.
YES YES
NO
Figure 3-8 - Loading the Shelter for Transport
CAUTION
THIS STEP REQUIRES FOUR PERSONNEL TO
LIFT THE SHELTER PACKAGE FROM THE
GROUND AND PLACE IT SOFTLY ON THE
GROUND.
Содержание DRASH S Series
Страница 8: ...THIS PAGE INTENTIONALLY BLANK...