STRIKING THE SHELTER
WP M --- . -- -95310-02
Striking Procedure
024.01 Prepare the Shelter
1.
Remove all equipment and accessories from inside the Shelter. If striking a “T” Model, be sure to also remove the face
plate curtain.
2.
Detach the floor by unfastening Velcro and all green hooks.
3.
Remove the floor from the Shelter and fold into quarters lengthwise.
Place floor far enough away so as not to interfere with striking the
Shelter.
4.
Close all interior and exterior windows.
5.
If a Vestibule curtain was installed, detach it and place in the Storage
Bag.
6.
Tie back all doorways with both the upper and lower door ties.
When striking a “T” Model, start at ground level and unfasten the
connector strips on both sides of the “T” boot. Continue until
reaching the grommet on the connector strip.
Figure 3-1 - Tie Back Doorways
7.
Remove all security stakes.
8.
Rewind the wind lines. Unwound wind lines may become tangled when the Shelter is packed.
025.01 First
Lift
1.
Position one person at each doorway.
2.
Start with the long sides. Each person should grip the interior and exterior doorway hubs with two hands at the five
foot level.
3.
On command, while maintaining visual contact, lift the wall slightly off the ground.
4.
Personnel positioned at the doorways should place one foot against the interior hub of the doorway and slide the bottom
of the shelter out about six to eight inches. The exterior hubs should now be slightly off the ground.
5.
Repeat steps 1 and 2 for the end walls. All walls should now be resting on the interior hubs.
026.01 Second
Lift
1.
Position the striking team as follows
2.
Position one person at each end wall of the Shelter.
a)
For Models 1, 2, & 3
Center one person on each side of the long walls.
b)
For Models 4,5 & 6
Position two people per long wall as indicated by the
stenciling on the exterior skirt and shown in Figure
3-2.
Figure 3-2 - Personnel Positions for Models 4, 5, & 6