4. OPERATION
Page 93
© 2005 DH Instruments, Inc.
Select the DUT with
<Label>
<King 3682>
and
<Output Label>
<Ps>
or
<Pt>
as desired. Press
[Next].
Enter the serial number of the DUT and other identifying information in the
fields provided at the top of the display. Do not change to
<IEEE Address>
Also verify that the range is correct, then press
[Next]
.
Select the
<King 3682 Ps Validation>
or
<King 3682 Pt Validation>
test
from the list and press
[Finish]
. There are no further initialization steps. The
test will complete initialization and start to run. The status bar updates
during initialization to display the current system operation.
Содержание ADCS-601
Страница 1: ... 2005 DH Instruments Inc ADCS 601 Air Data Calibration Standard Operation and Maintenance Manual ...
Страница 10: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page VIII N NO OT TE ES S ...
Страница 12: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page X N NO OT TE ES S ...
Страница 19: ...2 SYSTEM OVERVIEW Page 7 2005 DH Instruments Inc Figure 2 ADCS 601 system pneumatic schematic ...
Страница 21: ...2 SYSTEM OVERVIEW Page 9 2005 DH Instruments Inc Figure 4 ADCS 601 system electrical schematic ...
Страница 114: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 102 N NO OT TE ES S ...
Страница 116: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 104 N NO OT TE ES S ...
Страница 146: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 134 N NO OT TE ES S ...
Страница 168: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 156 N NO OT TE ES S ...
Страница 174: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 162 N NO OT TE ES S ...