6
STARTING UP
Before running, this Manual must have been carefully read and the instructions followed; wrong
settings and operations are thus prevented that could cause operating faults.
After performing the operations described in the INSTALLATION chapter, the inverter can be started.
Before starting the system, the pumps must be primed (filling and air bleeding).
When DGBOX is energised, it enters the
STARTING phase, which lasts 5 seconds,
after which DGBOX
returns to the same operating conditions in which it was when it was last switched off (in WORK mode
or OUT OF SERVICE mode).
During the STARTING phase
DGBOX can be switched to OUT OF SERVICE mode or SELF-LEARNING
mode as described below:
Power
network
STARTING
phase
(5 sec.)
waiting
WORK mode
if DGBOX was in ON
condition at last switch-off
OUT OF SERVICE mode
if DGBOX was in
OFF condition at last switch-off
pressing
START / STOP
OUT OF SERVICE mode
(suitable for
manual configuration)
pressing
ENTER
SELF-LEARNING mode
(Wizard)
-
To manually configure DGBOX
see “ACCESS TO MAIN MENU AND PARAMETER
MENU” in this page
-
To configure DGBOX in SELF-LEARNING
see “SELF-LEARNING CONFIGURATION”
at page 7.
ACCESS TO MAIN MENU AND PARAMETER MENU
in "
MAIN MENU AND PARAMETER MENU
" – page 8 - are
highlighted parameters that must be
configured
for the proper functioning of DGBOX (case referred to a single pump)
These parameters are described in the section "
SETTING THE PARAMETERS REQUIRED FOR
OPERATION”
– page 9
to
access
the MAIN
MENU press the button
SET for 3 sec.
to
-
scroll
the MAIN MENU
-
scroll
the PARAMETER
-
modify
the parameter values
use the keys
To
access and exit
the
MENU and the
parameter
use the
keys