background image

111253-01A

For more information, visit www.desatech.com

For more information, visit www.desatech.com

13

13

INSTALLATION FOR VERTICAL TERMINATION

Note:

 Vertical restrictor must be installed in all vertical installations.

1.

Determine the route your vertical venting will take. If ceiling
joists, roof rafters, or other framing will obstruct the venting
system, consider an offset (see Figure 19) to avoid cutting load
bearing members. 

Note:

 Pay special attention to these instal-

lation instructions for required clearances (air space) to com-
bustibles when passing through ceilings, walls, roofs, enclo-
sures, attic rafters, etc. Do not pack air spaces with insulation.
Also note maximum vertical rise of the venting system and
any maximum horizontal offset limitations.

2.

Set the fireplace in desired location. Drop a plumb line down
from the ceiling to the position of the fireplace exit flue. Mark
the center point where the vent will penetrate the ceiling. Drill
a small locating hole at this point.

Drop a plumb line from the inside of the roof to the locating
hole in the ceiling. Mark the center point where the vent will
penetrate the roof. Drill a small locating hole at this point.

VENTING INSTALLATION
INSTRUCTIONS

Continued

Flat Ceiling Installation

1.

Cut a 10 

3

/

4

" square hole in the ceiling using the locating hole as

a center point. The opening should be framed to 10 

3

/

4

"x10 

3

/

4

"

(273 mm x 273 mm) inside dimensions, as shown in Figure 9
on page 8 using framing lumber the same size as the ceiling
joists. If the area above the ceiling is an insulated ceiling or a
room, nail firestop from the top side. This prevents loose insula-
tion from falling into the required clearance space. Otherwise,
install firestop below the framed hole. The firestop should be
installed with no less than three nails per side (see Figure 20).

Figure 19 - Offset with Wall Strap and 45° Elbows

Figure 20 - Installing Firestop

If area above is not a room, install
firestop below framed hole.

If area above is a room, install
firestop above framed hole.

2.

Assemble the desired lengths of pipe and elbows necessary to
reach from the fireplace flue up through the firestop.  Be sure
all pipe and elbow connections are fully twist-locked (see Fig-
ure 8, page 8).

3.

Cut a hole in the roof using the locating hole as a center point.
(Cover any exposed open vent pipes before cutting hole in roof.)
The 10 

3

/

4

"x10 

3

/

4

" hole must be measured on the horizontal;

actual length may be larger depending on the pitch of the roof.
There must be a 1" clearance from the vent pipe to combustible
materials. Frame the opening as shown in Figure 9, page 8.

4.

Connect a section of pipe and extend up through the hole.

Note:

 If an offset is needed to avoid obstructions, you must

support the vent pipe every 3 feet. Use wall straps for this
purpose (see Figure 19). Whenever possible, use 45° elbows
instead of 90° elbows. The 45° elbow offers less restriction to
the flow of the flue gases and intake air.

5.

Place the flashing over the pipe section(s) extending through
the roof. Secure the base of the flashing to the roof and fram-
ing with roofing nails. Be sure roofing material overlaps the
top edge of the flashing as shown in Figure 19. There must be
a 1" clearance from the vent pipe to combustible materials.

6.

Continue to add pipe sections until the height of the vent cap
meets the minimum building code requirements described in
Figure 7 on page 6.

 Note

: You must increase vent height for

steep roof pitches. Nearby trees, adjoining rooflines, steep
pitched roofs, and other similar factors may cause poor draft
or down-drafting in high winds. Increasing the vent height may
solve this problem.

7.

Twist-lock the vent cap onto the last section of vent pipe.

Note:

 If the vent pipe passes through any occupied areas above the first

floor, including storage spaces and closets, you must enclose pipe. You
may frame and sheetrock the enclosure with standard construction
material. Make sure and meet the minimum allowable clearances to
combustibles. Do not fill any of the required air spaces with insulation.

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination

45° Elbow

Wall Strap

Roof Flashing

Ceiling Firestop

Содержание VV36ENA1 Series

Страница 1: ...ent alteration service or maintenance can cause injury orpropertydamage Refertothis manual for correct installation and operational procedures For assistance or additional infor mation consult a quali...

Страница 2: ...center venting system Itbringsinfreshairforcombustionthroughtheouterpipeand combustion gases are exhausted through the inner pipe If the glass door assembly and venting pipe are not properly seated co...

Страница 3: ...se this fireplace to cook food or burn paper or other objects 13 Do not use any solid fuels wood coal paper cardboard etc in this fireplace Use only the gas type indicated on fireplace nameplate 14 Th...

Страница 4: ...the location of your fireplace follow these rules Do not connect this fireplace venting to a chimney flue serving a separate solid fuel burning fireplace or appliance Due to high temperatures do not...

Страница 5: ...combus tible mantels may discolor PRE INSTALLATION PREPARATION Continued NOTICE This fireplace is intended for use as supple mental heat Use this fireplace along with your pri mary heating system Do n...

Страница 6: ...nlet 72 inches 182 9cm minimum L clearance above paved side walk or a paved driveway located on public property 84 inches 213 3cm minimum M clearance under veranda porch deck 12 inches 30 5cm minimum...

Страница 7: ...ing ceilings or attic spaces Install horizontal venting with a 1 4 rise for every 12 of run toward the termination VENTING INSTALLATION INSTRUCTIONS NOTICE Read these instructions completely be fore a...

Страница 8: ...f adjacent pipes Push pipe sections together and twist one section clockwise approxi mately one quarter turn until the sections are fully locked see Figure 8 Note Horizontal runs of vent must be sup p...

Страница 9: ...off Position the standoff cap assembly in the center of the 10 3 4 square hole and attach to exterior wall with wood screws provided see Figure 11 The siding standoff must sit flush against the exteri...

Страница 10: ...chart with critical minimum and maximum dimensions which MUST be met IMPORTANT Rememberthatahorizontalrunofventingmust have a 1 4 rise for every 12 of run toward the termination Figure 13 Typical Hori...

Страница 11: ...ntallythroughwall over 12 horizontal pipe Basement installation where one foot clearance from ground to termination is possible SNORKEL TERMINATION INSTALLATION Recommended Applications Installations...

Страница 12: ...NG INSTALLATION INSTRUCTIONS Installation Planning Cont HORIZONTAL SYSTEM INSTALLATION USING TWO 90 ELBOWS The following configurations show the minimum vertical rise requirements for a horizontal sys...

Страница 13: ...a above is a room install firestop above framed hole 2 Assemble the desired lengths of pipe and elbows necessary to reach from the fireplace flue up through the firestop Be sure all pipe and elbow con...

Страница 14: ...Round High Wind Termination Shown Venting with Two 90 Elbows Vertical V1 Horizontal H 5 min 6 max 6 min 12 max 7 min 18 max 8 min 20 max Note Vertical V1 Vertical V2 40 max Figure23 VerticalVentingCon...

Страница 15: ...Horizontal Run Vertical Round High Wind Termination Shown Note Install restrictor into inner collar of fireplace as shown 45 Elbow PARTS LISTS FOR VENTING KITS AND COMPONENTS FOR V36 AND VV36 SERIES D...

Страница 16: ...ion Galvanized 1 01496 Horizontal Square Termination Galvanized 1 FIREPLACE INSTALLATION VENTING INSTALLATION INSTRUCTIONS Parts Lists for Venting Kits and Components FIREPLACE INSTALLATION Check Gas...

Страница 17: ...ide of the firebox Route power cord through exit hole and plug the power cord into a wall receptacle near the firebox b If your firebox installation is recessed and or pre wired plug the power cord in...

Страница 18: ...til it clicks off If the blower is ON and has been running with the fireplace operating the blower will continue to run for a short time after the fireplace has been turned off As the thermal switch c...

Страница 19: ...n must include an equipment shutoff valve union and plugged 1 8 NPT tap Locate NPT tap within reach for test gauge hook up NPT tap must be upstream from fireplace see Figure 31 IMPORTANT Install main...

Страница 20: ...t provided 1 Open lower louver door panel by gently pulling forward 2 Route flexible gas line provided by installer from equipment shutoff valve to fireplace Route flexible gas supply line through one...

Страница 21: ...louvers outward To install or replace items removed simply reverse the procedures above Figure 36 Removing Louver Panel Louver Panel CAUTION Wear gloves and safety glasses while handling or removing...

Страница 22: ...et cool before installing brick liner This brick liner kit is optional You may purchase brick liner from your local retailer or see Accessories page 37 CAUTION Always handle brick panels with two hand...

Страница 23: ...ont of firebox bottom in ar eas that are visible only It is not necessary to use all of the lava rock provided NOTICE Do not put lava rock on burner or under burner Placing lava rock on burner will ca...

Страница 24: ...lower louver panel Figure 47 Installing the WRC Remote Receiver Fireplace Receptacle Remote Control Receiver Extension Cord Ignition Module Plug Figure 48 Installing Battery into Back of Handset Pull...

Страница 25: ...lame appears at pilot If lighting the appliance for the first time each season it may take several attempts before the supply gas can reach the pilot and main burners If the appliance will not stay li...

Страница 26: ...ve any dust dirt or other obstructions that will hinder the flow of air BURNER FLAME PATTERN Burner flames will be steady not lifting or floating Flame patterns will be different from unit to unit and...

Страница 27: ...be used CLEANING AND MAINTENANCE CAUTION Wear gloves and safety glasses while handling or removing broken glass Do not remove if glass is hot Keep children and pets away from glass WARNING Donotopera...

Страница 28: ...d repair 3 Remove debris and dirt inspect and clean any other possible obstructions 4 Contact your gas supplier to check pressure 5 Have a qualified technician replace pi lot line 6 Replace control va...

Страница 29: ...ial OBSERVED PROBLEM Fireplace produces a clicking ticking noise just after burner is lit or shut off Slightsmokeorodorduringinitialoperation Gas odor even when control knob is in OFF position Gas odo...

Страница 30: ...30 ILLUSTRATED PARTS BREAKDOWN Models V V36ENA 1 V V36ENSA 1 V V36ENHA 1 V V36EPA 1 V V36EPSA 1 V V36EPHA 1 ILLUSTRATED PARTS BREAKDOWN MODELS V V36ENA 1 V V36ENSA 1 V V36ENHA 1 V V36EPA 1 V V36EPSA 1...

Страница 31: ...108011 02 Bottom Panel Louver Assy 1 6 Fireplace Top 1 7 Fireplace Top Insulation 1 8 Fireplace Surround 1 9 109082 01 109082 01 109082 01 Heat Shield 1 10 108032 01 108032 01 108032 01 Log Set 1 10...

Страница 32: ...TS BREAKDOWN Models V V36ENA 1 V V36ENSA 1 V V36ENHA 1 V V36EPA 1 V V36EPSA 1 V V36EPHA 1 ILLUSTRATED PARTS BREAKDOWN BURNER ASSEMBLY FOR MODELS V V36ENA 1 V V36ENSA 1 V V36ENHA 1 V V36EPA 1 V V36EPSA...

Страница 33: ...1 4 PPH Zinc 4 16 26808 Valve Bracket 1 17 26827 Switch Bracket 1 18 11147 Screw 10 24 x 1 2 PPH Zinc 2 19 11186 Screw 8 32 x 1 Zinc 4 20 14115 Spade Tongue Connector 1 21 14120 Spade 1 4 Female Conn...

Страница 34: ...gas supplier TECHNICAL SERVICE You may have further questions about installation operation or troubleshooting If so contact DESA s Customer Service Depart mentat1 866 672 6040 Whencalling pleasehavey...

Страница 35: ...Completed College Completed Graduate School 13 Age of Purchaser Under 20 20 29 30 39 40 49 50 59 60 or Over 14 Buyer s total annual household income Under 15 000 15 000 to 19 999 20 000 to 34 999 35...

Страница 36: ...111253 01A For more information visit www desatech com For more information visit www desatech com 36 2701 Industrial Drive P O Box 90004 Bowling Green KY 42102 9004 Postage Required TAPE TAPE...

Страница 37: ...FPD36P Filligree Panel Kit Platinum FPD36PB Filligree Panel Kit Polished Brass LOUVER TRIM KIT Rolled Louvers Only Not Shown LT36B Rolled Louver Trim Kit Brushed Brass LT36P Rolled Louver Trim Kit Pla...

Страница 38: ...ansportation and any and all such other costs related to repairing a defective heater will be the responsibility of the owner TO THE FULL EXTENT ALLOWED BY THE LAW OF THE JURISDICTION THAT GOVERNS THE...

Отзывы: