![Deprag SZG Controller 6 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/deprag/szg-controller-6/szg-controller-6_operating-manual_2485171028.webp)
SZG CONTROLLER 6 - ENGLISH
28
9
Controller function
The complete cycle of the feeder is made up of the following phases:
•
Minimum driver run time t
v
•
New cycle delay t
n
•
Air-push delay t
z
•
Part air-push delay t
s
•
Separator forward time t
e
•
Vibratory bowl run time t
f
•
Air blast extension t
b
Start
Bowl
t
v
Air-push
t
n
t
s
t
f
t
z
Separator
t
e
Blow air
t
b
The MINIMUM DRIVER RUN TIME is the minimum time the screwdriver must run before the controller
activates the inlet cycle.
The NEW CYCLE DELAY is the length of time between the moment the screwdriver switches off and the
beginning of the separation and feeding process of the next feed part.
The AIR-PUSH DELAY is the length of time from the activation of the valve moving the separator forward to
inlet position to the activation of the valve for the air-push
.
The PART AIR-PUSH DELAY is the length of time the valve is open for the air-push.
The SEPARATOR FORWARD TIME is the length of time when the separator stays in inlet position.
The BOWL RUN TIME is the length of time the vibratory drive remains activate after separation is finished.
The RAIL BLOW-OFF TIME is the length of time the air deflector valve on the vibratory bowl stays open
after switching off the vibratory drive.
Содержание SZG Controller 6
Страница 47: ...SZG CONTROLLER 6 ENGLISH 47 15 Notizen Notes...