
SECONDARY CONTROLS
58
Figure 26
Control cap assembly
P07
P110
ITEM DESCRIPTION
PART NO. QTY.
PART NO. QTY.
1
Control Cap
032-91842
1
032-92229
1
2
Plug
449-00015
1
449-00599
1
3
O-ring, 70 S-1 ARP 115
671-00115
1
671-00115
1
4
Screw, M16
311-50001
1
311-50001
1
5
Nut, M16
031-91822
1
031-91822
1
6
Plug, SAE-8
488-35018
1
488-35018
1
7
O-ring 90 S-1 ARP 908
691-00908
1
691-00908
1
CONTROL CAP DISASSEMBLY
1.
See Figure 26.
Remove nut (5) and maximum volume screw
(4).
2. Remove 4 screws holding cap to pump.
3. Remove cap assembly from pump.
ASSEMBLY
See page 26 for tightening torque on plugs
1. Install O-rings on interface between cap and pump control
pad. Install cap on pump housing as indicated on the applic-
able view (pg. 24), guiding the control piston into the bore.
2. Torque the assembly bolts to 75 lb.• ft., 102 N m.
3. Install screw (4) in cap. Install O-ring (3) on nut (5).
Install nut (5) on screw.
4. Adjust screw till pump is slightly on stroke and lock nut (5).
5. Install O-ring (7) on plug (6). Install plug in nut (5). Torque
plug (6).
PARTS LIST FOR FIGURE 26
P07 control cap assembly S22-15325
P110 control cap assembly S22-15613
1
2
3
4
5
1
2
3
4
5
ITEM DESCRIPTION
PO7 PART NO. P110 PART NO. QTY.
1
Servo tube w/nut & sleeve
S22-16032
S22-16077
1
2
O-ring, 90 S-1
691-00906
691-00113
2
3
Elbow fitting
492-15382
492-15426
2
4
O-ring, 90 S-1 ARP 012
691-00012
691-00012
2
5
Fitting retaining ring
-
492-15417
2
Figure 24
cw rotation control tubing
Figure 25
ccw rotation control tubing
PARTS LIST FOR FIGURE 24
cw rotation control tubing S22-16035 (P07) S22-16037 (P110)
PARTS LIST FOR FIGURE 25
ccw rotation control tubing S22-16036 (P07) S22-16038 (P110)
ITEM DESCRIPTION
PO7 PART NO. P110 PART NO. QTY.
1
Servo tube w/nut & sleeve
S22-16076
S22-16078
1
2
O-ring, 90 S-1
691-00906
691-00113
2
3
Elbow fitting
492-15382
492-15426
2
4
O-ring, 90 S-1 ARP 012
691-00012
691-00012
2
5
Fitting retaining ring
-
492-15417
2
www.comoso.com
Содержание P07 C-mod
Страница 12: ...PUMP PARTS LISTS 12 Ref Figure 1 Exploded view of pump with pressure compensator control www comoso com ...
Страница 54: ...PQ HIGH RESPONSE CONTROL 54 PQ CONTROL IN PROCESS OF DEVELOPMENT www comoso com ...
Страница 55: ...PQ HIGH RESPONSE CONTROL 55 PQ CONTROL IN PROCESS OF DEVELOPMENT www comoso com ...
Страница 56: ...PQ HIGH RESPONSE CONTROL 56 PQ CONTROL IN PROCESS OF DEVELOPMENT www comoso com ...
Страница 57: ...PQ HIGH RESPONSE CONTROL 57 PQ CONTROL IN PROCESS OF DEVELOPMENT www comoso com ...
Страница 74: ...74 TEST PROCEDURE PQ CONTROL IN PROCESS OF DEVELOPMENT www comoso com ...