
3. Maintenance and troubleshooting
MERLION PLUS - E500
STD04
Page 22 of 50
3.3 Pump Service Instructions
Disassembling of E500 pump:
-Loosen the M10 bolts in a star configuration
-Remove the Outlet Valve Cover
-Insert a M6 screw and pull out the Outlet Valve Cap
-Pull out the Valve using a plier
The valve is made of plastic, take care not to break the
plastic valves
-Check the Valve for damages, replace if necessary
- Use a sharp object to “fish” out the O-ring at the
bottom
Take care not to scratch the interior of the pump
-Loosen and remove the M10 Bolts in the front.
Remove all but 2 bolts to support the Manifold & Pump
Head
-Remove the remaining bolts and pull out the Manifold
followed by the Pump Head.
Take care not to drop the Pump Head on the Plungers
-
Push out the Valve from the front with a brass rod.
-Take care not to scratch the interior of the pump
-Check the Valve for damages, replace if necessary
-Use a finger to remove the Diffuser
-Push out the Back Ring & Pressure Ring from the back
with a brass rod. Take care not to scratch the interior
of the pump.
-Use a screwdriver or pliers to fish out the packing.
Take care not to scratch the interior of the pump.
Once taken out, all packing must be changed.
Содержание Merlion Plus E500
Страница 32: ...4 Machine Spare Parts Lists MERLION PLUS E500 STD04 Page 31 of 50 4E ii E500 Pump Spare Parts Repair Kit List ...
Страница 35: ...4 Machine Spare Parts Lists MERLION PLUS E500 STD04 Page 34 of 50 E500 Un loader Assembly ...
Страница 40: ...4 Machine Spare Parts Lists MERLION PLUS E500 STD04 Page 39 of 50 4F Electrical Assembly Wiring diagram ...