Commissioning by loading the settings
from another solar power inverter
It is possible in all countries and for all grids to load the settings
from another solar power inverter.
ATTEnTIOn
The IP 65 degree of protection is no longer guaranteed when the USB interface protective cover is removed.
► Only remove the protective cover when necessary.
► Where possible, use a Micro-USB stick. The protective cover is designed to be screwed down over a Micro-USB stick.
1. If you have not already done so, save the settings of the
other solar power inverter to a USB drive, see
“11.5 Sav-
ing settings”, p. 68
.
nOTE
: The STUP_###.CFG fi le must
be in the main directory of the USB
drive. The ### characters represent
the RS485 ID of the solar power
inverter from which the data is to be
loaded, for example "001".
2. Check all connections and cables for damage and correct
seating. Correct the installation if necessary.
DC DISCONNECT
OFF
ON
3. Switch on the DC isolating switch.
→ The startup process of the solar power inverter will
begin.
After the startup process and the automatic self-test,
the commissioning procedure of the inverter starts
and the
Installation
menu is displayed.
➔
continue
Language: English
-------------------
Installation
4. To change the language, press the button and then
set the language using the
buttons. Press the
button to apply the language.
Available languages:
Czech | Danish | Dutch | English |
French | German | Italian | Portu-
guese | Romanian | Slovak | Slove-
nian | Spanish
➔
-------------------
continue
Language: English
-------------------
Installation
5. Press the
buttons to select
continue
and then
press the button.
→ This displays the
Load USB Data
menu.
➔
No
Yes
-------------------
Load USB data
6. Press the
buttons to select
Yes
and then press the
button.
and press ENTER
Insert USB Pendrive
Load USB data
7. Insert USB Pendrive and press .
nOTE
: The STUP_###.CFG fi le must
be in the main directory of the USB
drive. The ### characters represent
the RS485 ID of the solar power
inverter from which the data is to be
loaded, for example "001".
➔
Load swap data
Load settings
-------------------
Load USB data
8. Press the
buttons to select
Load Settings
and
then press the button.
→ The solar power inverter will then search for fi les on
the USB drive.
When fi les are found, the
Select RS485 ID
menu is
displayed.
nOTE
: If the message
No fi les
found
is displayed, make sure the
fi les are in the main directory of the
USB drive.
Содержание SOL10.0-1TR3-E4
Страница 1: ...Operation and Installation Manual for SOL10 0 1TR3 E4 SOL11 0 1TR3 E4...
Страница 89: ......