4-5 Location
4-5-1 Moving
1. NH-series UPS has casters to roll at a short distance to your desired location.
Under unpacking procedure, employ a suitable machine with sufficient capacity to
move UPS.
Please pay extremely attention when unbolt UPS from shipping pallet. Prevent any
accident caused by unexpected moving.
2. Casters are suitable for moving on even surface. Avoid moving UPS on bumpy route.
This may cause damage of UPS or tip-over accident.
3. When you need to move UPS for a long distance, please employ a suitable machine but
not by casters of UPS.
4. Refer to Table 4-1 to get the weight of UPS and external battery pack.
4-5-2 Positioning
1. Position UPS or external battery pack by suitable machine.
2. Refer to Table 4-1 and 4-2 , make sure to position UPS at a suitable floor which can
sustain for the weight.
3. When UPS has positioned, please make sure to use the stop of casters to remain UPS in
stable condition.
Table 4-1
Floor Loading for UPS
Input : 220/380 Vac / Output : 220/380 Vac
Capacity
(KVA)
15 20 30 40 50 60 80
Weight (Kg)
125 125 175 175 210 210 244
Floor
Loading
(kg/
㎡
)
283 283 396 396 475 475 552
4-3