Delta Water Engineering Escalda Скачать руководство пользователя страница 12

P0522 

         DELTA WATER ENGINEERING 

V01/2017/P12

 

5.5

 

Open a tap behind the softener so a flow runs through it. Some air may flow 
from the tap; this comes from the softener. This will happen only once; at 

start-up.  Once  only  water  flows  from  the  tap,  and  no  more  air,  close  the 
tap.

 

 

5.6

 

Perform a manual regeneration. 

 

5.6.1

 

 

Use a hex key number 5 to turn the program disk (PRG) manually. 

 

Turn PRG counter clockwise until it is in above position. When the arrow and 
the  small  line  on  the  transparent  cover  reach  the  area  marked  by  “B” 

(brining), the regeneration will start. Immediately, the PRG will drop down a 

little (you will be able to see and hear this). “R” stands for refill (refilling the 
container with water at the end of the regeneration stage).  

To make sure the softener is in regeneration, there should be a small water 
flow to the drain, and the water level in the container should drop. 

 

5.6.2

 

 

Let regeneration perform until it stops automatically. The estimated time is 

approx. 12 minutes. When regeneration has stopped, no more water flows 
to the drain. This is a clear indication that the regeneration stage is over. 

 

5.6.3

 

 

Open a tap behind the softener for several minutes to allow residual water 

to be flushed from the tubing. 

 

5.6.4

 

 

Check  outgoing  hardness  with  a  “hardness  test  kit”  (not  supplied  by 

Delta). Adjust blending if necessary. 

 

 
 

 
 

Содержание Escalda

Страница 1: ...P0522 DELTA WATER ENGINEERING V01 2017 P1 D De el lt ta a W Wa at te er r E En ng gi in ne ee er ri in ng g...

Страница 2: ...IO ON N G GU UI ID DE E E ES SC CA AL LD DA A 1 Parts 1 BYPASS 7 WATER OUTLET 2 VALVE HOUSING 8 BLENDING REGULATOR 3 RESIN TANK 9 HARDNESS REGULATOR 4 CONTAINER FOR DEVICE AND SALT 10 TO BRINE VALVE 5...

Страница 3: ...st 1bar to ensure a good functioning of the softener If this pressure of at least 1bar can t be guaranteed a Pressure Guard is available at your Delta supplier The water should be free of sediment chl...

Страница 4: ...ons The Delta Bypass has a connection The direct connections on the water softener are available in and 1 Caution before installing the softener set the Bypass in bypass mode not in service 3 3 Connec...

Страница 5: ...arate instruction leaflet with detailed information has been added to the device 3 5 To connect the flexible drain pipe from the softener par 3 3 and from the overflow par 3 4 with a fixed drain pipe...

Страница 6: ...t container is higher than the connection on the D O D 3 5 3 If the part with the connections for the tubes is disconnected from the transparent part snap them back together Even if the two parts are...

Страница 7: ...with the round opening Check if the brine valve is installed properly Open the small cover by pressing it gently at both sides The brine valve has to be installed with the right side up and all the w...

Страница 8: ...be avoid kinks 3 8 The unit can be installed in the container in three different ways at the back to the left or to the right The support at the bottom of the container must be placed accordingly Plea...

Страница 9: ...P0522 DELTA WATER ENGINEERING V01 2017 P9 3 8 2 Connections to the left As in 3 8 1 3 8 3 Connections to the right As in 3 8 1...

Страница 10: ...settings of CaCO3 10 ppm CaCO3 1 fh 1 dh 1 78 fh Adjust the hardness regulator to the measured value This requires a hex key number 5 4 2 Blending regulator part number 8 on the illustration on page...

Страница 11: ...ou do not use a Bypass open the main valve slowly as described in 5 4 5 2 Fill salt bin with salt in the provided space Use only specific salt tablets that are suitable for softeners 5 3 Add water in...

Страница 12: ...iately the PRG will drop down a little you will be able to see and hear this R stands for refill refilling the container with water at the end of the regeneration stage To make sure the softener is in...

Страница 13: ...the container First the valve house cover make sure the connections fit in the large opening and the drain in the small opening Then place the front lid For future salt refills only the front lid has...

Страница 14: ...f the resin and damage the synthetic material Failure to comply with these regulations a failure of the device or accident claim will not be eligible for warranty and stops the product responsibility...

Страница 15: ...e valve and push the black 4mm tubing coming from the brine valve back in the press fitting on the valve The unit will now complete its regeneration After the suction zone marked will the letter B Bri...

Страница 16: ...dge about hydraulic softeners and domestic plumbing Proper working of the softener will be determined by proper installation An annual control of your Delta softener will guarantee optimal functioning...

Отзывы: