![Dell PowerConnect B-DCX-4S Backbone Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/dell/powerconnect-b-dcx-4s-backbone/powerconnect-b-dcx-4s-backbone_hardware-reference-manual_79255066.webp)
52
PowerConnect B-DCX-4S Backbone Hardware Reference Manual
53-1001808-01
RRP: Control processor blade (CP8)
5
4. If the functioning CP blade is performing as the active CP blade, go to
step 5
. If the faulty CP
blade is performing as the active CP blade, fail over the blades:
a. Log in to the faulty CP blade as admin, using either a Telnet or a serial console connection.
If you connect successfully to the faulty CP, continue to step b.
If you cannot connect to the faulty CP, remove the faulty CP blade for repair as follows:
•
Turn the CP blade off and notify the PowerConnect B-DCX-4S of a hot swap request by
sliding the slider switch in the left ejector to the off position (
Figure 23
).
•
Wait until the active CP LED on the functioning CP blade is lit. Remove the CP blade.
b. Enter haFailover. The functioning CP blade becomes the active CP blade.
c. Wait until the status LED on the functioning CP blade is no longer lit.
d. Enter haShow from the functioning CP blade (the new active CP blade) to verify the failover.
This is an example of failing over a CP blade:
Fabric OS (cp1)
cp1 login:
admin
Password:
switch:admin>
hashow
Local CP (Slot 5, CP1): Active
Remote CP (Slot 4, CP0): Standby, Healthy
HA enabled, Heartbeat Up, HA State synchronized
switch:admin>
hafailover
Local CP (Slot 5, CP1): Active
Remote CP (Slot 4, CP0): Standby, Healthy
HA enabled, Heartbeat Up, HA State synchronized
Warning: This command is being run on a redundant control
processor(CP) system. If the above status does not indicate
'HA State synchronized', then the CPs are not synchronized
and this operation will cause the active CP to reset. This
will cause disruption to devices attached to both switch 0
and switch 1 and will require that existing Telnet sessions
be restarted. To reboot a single logical switch on this
system, use the switchreboot command while logged in to
that logical switch.
Are you sure you want to fail over to the standby CP [y/n]?
switch:admin>
haShow
Local CP (Slot 5, CP1) : Standby, Healthy
Remote CP (Slot 4, CP0) : Active
HA Enabled, Heartbeat Up, HA State Synchronized
5. Enter firmwareShow to note the firmware version of the active CP blade.
6. Enter haDisable from the active CP blade to prevent failover or communication between the CP
blades during the replacement.
7. Logged into the active CP, use the configUpload command to upload the PowerConnect
B-DCX-4S configuration to a specified FTP server. Enter information at the prompts.
This is a sample of backing up the configuration files:
switch:admin>
configUpload
Protocol (scp or ftp) [ftp]:
ftp
Содержание PowerConnect B-DCX-4S Backbone
Страница 8: ...viii PowerConnect B DCX 4S Backbone Hardware Reference Manual 53 1001808 01 ...
Страница 24: ...10 PowerConnect B DCX 4S Backbone Hardware Reference Manual 53 1001808 01 Network manageability 1 ...
Страница 113: ...PowerConnect B DCX 4S Backbone Hardware Reference Manual 99 53 1001808 01 Environmental regulation compliance A ...
Страница 114: ...100 PowerConnect B DCX 4S Backbone Hardware Reference Manual 53 1001808 01 Environmental regulation compliance A ...
Страница 134: ...120 PowerConnect B DCX4S Backbone Hardware Reference Manual 53 1001808 01 ...