Figure 71. I/O panel screw locations
8. Install the new dual-port COM cable (included). Connect to the front I/O panel with the port labeled A to COM1 and B to
COM2, then connect the other end of the cable to the motherboard header.
Figure 72. Connect new COM ports to I/O panel
Figure 73. Connect dual-port COM cable to motherboard header
42
Installation procedure for 2x GbE LAN uFM module
Содержание EMC Edge Gateway 5200
Страница 1: ...Dell EMC Edge Gateway 5200 Service Manual January 2022 Rev A00 ...
Страница 19: ...Figure 26 Reattach the bottom panel Installation procedure for 4G and 5G expansion modules 19 ...
Страница 28: ...Figure 43 Antenna hole caps 28 Installation procedure for 2x isolated COM 422 485 or 232 uFM module ...
Страница 46: ...Figure 80 Antenna hole caps 46 Installation procedure for 2x GbE LAN uFM module ...