![Degelman PRO-TILL 10 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/degelman/pro-till-10/pro-till-10_operators-and-parts-manual_2464931004.webp)
Scraper Position Overview
(Rubber Roller)
Set Gap
distance at
1/4”
to
3/8”
from roller surface.
Storage
Position
Maintenance
Position
Engaged
Position
Remove the 4 bolts to rotate into
or out of “Storage position”,
then re-install.
Loosen the 4 bolts to rotate up into
“Maintenance
Position”
& secure.
Loosen the 4
bolts to rotate
downward.
Set the scraper
clearance
(
1/4”
to
3/8”
).
Properly tighten.
• Hydraulic Connections/Hoses
• Working points & pins
• Check for missing, worn or
damaged parts.
Maintenance
(Check Machine Daily)
GPS Reference
(Set overlap to 4” per side)
(with 20" discs)
2" Depth
Pro-Till 10
117” (9.98m)
Pro-Till 13
157” (3.99m)
(with 20” discs)
MAX Depth
Pro-Till 10
119” (3.02m)
Pro-Till 13
159” (4.04m)
* Refer to operators manual for
complete safety and operation info.
E
Test. Check. Adjust.
F
Raise for Headland Turns.
1
100m
100m
10-12 MPH
(Ideal Operating Speed)
(NOTE: Adjust top link of 3-point hitch to level unit at desired depth.)
© 2022 Degelman Industries LP
Содержание PRO-TILL 10
Страница 2: ......
Страница 24: ... 18 142766 PRO TILL 10 13 10 February 2022 ...