background image

10

 

 

 

 

Picture 10

.

 Dimensions of DEFRO HOME VITAL 51 S BL and DEFRO 

HOME VITAL 51 BP (mirror reflection). 

 

Picture 11

.

 Dimensions of DEFRO HOME VITAL 51 S C.

 

 

4.3.

 

EQUIPMENT 

The gas-fired heater is delivered on a pallet, foil-wrapped and are 

fully assembled. Scope of delivery can include additional components 
and  subassemblies,  according  to  the  order  of  the  user.  Standard 
components of the equipment are specified in the table 2. 

Table  3. Equipment of DEFRO HOME VITAL room heater. 

Standard equipment of gas fireplace 

Unit 

Quan

tity 

Equipment operating manual 

pcs. 

Operating manual and warranty card for electronic 
controller 

pcs. 

Controller with a valve 

set 

4.4.

 

FUEL PARAMETERS 

Gaseous fuel of second or third family acc. to the EN 437 standard 

is used as a primary fuel for the DEFRO HOME VITAL heater. 

The heater is factory adapted to one type of fuel acc. to the 

customer’s order and can be operated only with this fuel. 

Conversion of the equipment to the other type of fuel and 

change of gas on your own and without conversion is 

forbidden!

 

 Contact the manufacturer if it is required to change a fuel 

type. 

4.5.

 

SPARE PARTS 

To  obtain  information  on  availability  of  spare  parts  for  gas-fired 

fireplace  or  inquiries  about  equipment  servicing  please  contact  with 
DEFRO Service Center or Authorized DEFRO Service. 

 

DEFRO Sp. z o.o. Sp. k  
Centrum Serwisowe 
Ruda Strawczyńska 103a 
26-067 Strawczyn

 

@

 

[email protected] 

5.

 

TRANSPORT 

Room heater in the packing material should be transported in the 

horizontal position using a special trolley. In special cases and on short 
distances, it is allowed to transport it in vertical position. 

6.

 

SYSTEM 

Check the local conditions for distribution before 

installation (identify type of gas and its pressure) and 

whether the current settings of a heater are correct. 

VITAL heater should be supplied with the same type of gas 

as the other gas-fired equipment (if any) in the home of their 

installation. 

Installation of the gas-fired heater should be performed by qualified 

personnel. All assembly operations should be performed in accordance 
with the applicable national and local regulations within the scope of 
fire protection, requirements of gas distributor and local authorities. 

Gas system and flue gas handling system should be in compliance 

with  the  Regulation  of  the  Minister  of  Infrastructure  of  12.04.2002 
(Journal of Laws of 2002, no. 75, item 690) with all subsequent acts 
amending this regulation. 

Obtain  all  necessary  consents  from  the  appropriate  authorities 

before  the  installation:  Regional  gas  company,  chimney  sweeping 
company and building administration. 

6.1.

 

INSTALLATION LOCATION 

Selection of installation location of the gas-fired heater should be 

based on meeting of the following conditions: 

 

access  to  gas  piping  system  should  ensure  ease  of 
connection; flexible hoses should not be excessively twisted; 

 

access to chimney system should ensure as low number of 
bends as possible; 

 

Distance  of the  heater  from  non-flammable components  of 
the  housing  should  not  be  smaller  than  80  mm  and 
temperature of walls exposed to direct heating by the heater 
should not exceed 80 

C. 

The room heater is intended for installation only in vertical position 

and  should  be  placed  on  hard  and  non-flammable  substrate  with 
suitable load-carrying capacity. It is forbidden to install the heater as a 
unit hanging on the wall!  

6.2.

 

CONNECTION TO THE GAS PIPING SYSTEM 

The device is intended only for one type of fuel acc. to the 

customer’s orders indicated on the first page of the manual 

and declaration on the rating plate. 

848

94

9

8

3

5

5

1

0

850

2

9

7

49

Ø

150

329

741

247

4

9

0

989

50

>9

63

330

29

7

Ø

150

889

5

1

0

1

1

5

9

8

783

189

5

0

0

Содержание VITAL 37S

Страница 1: ...erating manual gas fired convection room heater DEFRO HOME VITAL 37 S 51 S BP BL U C T gas type G2 350 G20 G27 G31 G30 translation of original operating manual edition 1 b May 2021 destination countri...

Страница 2: ...deklaracja musi by przekazana wraz z urz dzeniem w przypadku odst pienia w asno ci innej osobie This Declaration of Conformity becomes invalid if any changes have been made to the device if its constr...

Страница 3: ...illed copy of the Warranty Card to the following address DEFRO Sp z o o Sp k Centrum Serwisowe Ruda Strawczy ska 103a 26 067 Strawczyn serwis defro pl By sending back your Warranty Card you will be re...

Страница 4: ...2 Preparation 16 7 3 Information 16 7 4 Deactivation of remote control function 16 7 5 Activation of remote control function 16 7 6 Control of FIREPLACE with a remote control 16 7 6 1 Setting temperat...

Страница 5: ...34 13 PRODUCT WARRANTY TERMS AND CONDITIONS 35 13 1 Warranty conditions 48h Service 36 14 WARRANTY CARD 37 15 CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE 38 16 WARRANTY CARD copy to send back 39 17...

Страница 6: ...m the action of high temperature Non compliance with the recommendations distinguished in this way may cause a fire or burns Hint Informative symbol Useful information and hints are marked in this way...

Страница 7: ...The body of the heater is made of steel sheet with combustion chamber located inside and lined with additional panels made of sheet rear and sides Picture 1 Design of DEFRO HOME VITAL heater 1 explos...

Страница 8: ...pply V DC 6 Weight1 kg 90 90 90 90 90 1 Device weight depends on selected design version and its equipment 2 Level for C11 equipment acc to PN EN 613 2002 A1 2004 Table 2 Technical data of GV60 regula...

Страница 9: ...O HOME VITAL 51 S U Picture 8 Dimensions of DEFRO HOME VITAL 51 S T Picture 9 Dimensions of DEFRO HOME VITAL 51 S 983 47 808 330 297 150 883 370 115 98 111 783 188 350 828 309 781 370 107 98 154 720 4...

Страница 10: ...ts pressure and whether the current settings of a heater are correct VITAL heater should be supplied with the same type of gas as the other gas fired equipment if any in the home of their installation...

Страница 11: ...reduction of total allowable length of the pipe by 1 meter First elbow connected to the equipment is not taken into consideration Vertically lead pipes should be fixed to the wall using brackets arra...

Страница 12: ...f the existing chimney in connection with a terminal should be protected against flooding or clogging and the terminal should be installed in a way ensuring its correct operation Penetration of concen...

Страница 13: ...y burner by turning the screw clockwise rotation increases the pressure When the adjustment has beencompletedyoushouldprotect the following fixtures with blanking plugs pressure control screw and afte...

Страница 14: ...tion of concentric coaxial system acc to allowed configuration for ducts leading set the flue gas flow damper in half of opening position Close the window panel and set maximum load of the heater Meas...

Страница 15: ...of contact with wooden wall or wall made of other inflammable material it is appropriate to insulate flue gas discharge pipe In case of floor made of inflammable materials it is appropriate to prepar...

Страница 16: ...control knob to ON Make sure that four 4 AA batteries have been correctly installed in the receiver Remote control operating at the 868 MHz band also requires preparation You should enter the transmi...

Страница 17: ...tton firing with one button on remote control or two button and at the same time firingup with two buttons until twoshort audible signals will be heard and an icon confirming the ignition will be flas...

Страница 18: ...what temperature should be maintained Eco mode controls the fireplace so as to maintain the set temperature but inthemore economical way Thecontroller forces maximum height of the flame if thetempera...

Страница 19: ...ed once again for a while and minutes field will be flashing Select minutes using buttons Confirm the setting once again with the button The system will go to configuration of switch off time Switch o...

Страница 20: ...in manual control mode All operations are then performed directly from the GV60 valve level located inside the cabinet Control components used during manual control are presented on the picture 24 To...

Страница 21: ...ion locked for two minutes Second thermocouple in incorrect position Incorrect connection of cables of the second thermocouple Decorative items installed incorrectly Clogged openings of the primary bu...

Страница 22: ...ange of settings No flame control from controller level No WiFi connection with WiFi module of the controller Switched off WiFi connection on the control device F42 Check WiFi Flame does not respond t...

Страница 23: ...omponents should not touch the window panel Components should not cover the flame of the control burner It is forbidden to cover outlet holes of the primary burner and gaps in the floor of the combust...

Страница 24: ...installation of chunks 2 Lay item no 1 as presented on both photos The component should remain stable at the centre of the ignition burner and parallel to the rear wall The wider end of thechunk shoul...

Страница 25: ...th photos Chunk should be stable due to incisions adapted to the burner The distance between the holes in the burner and the edge of the chunk should be approx 5 mm right corner of the burner the edge...

Страница 26: ...c to the incision and photos Similarly as for chunk no 2 the distance between the holes in the burner and the edge of the chunk should be approx 5 mm left corner of the burner the edge of the ceramic...

Страница 27: ...27 5 Lay chunk no 4 as presented on the photos The chunk should not cover burner openings and should be supported in half way on chunk no 1 gas holes...

Страница 28: ...28 gas holes left corner of the burner...

Страница 29: ...29 6 Lay item no 5 as presented on photos The chunk should be stable and should not cover gas openings in the floor right corner of the burner gas gaps...

Страница 30: ...30 7 Set the chunk no 6 as the last one it should be laid on chunk no 5 and be supported on chunk no 4 and right corner of the burner...

Страница 31: ...31 right corner of the burner...

Страница 32: ...32 8 3 LAYING OF DECORATION IMITATING THE STONES Items made of stone should be laid on the floor of the combustion chamber so as to avoid covering of gas openings...

Страница 33: ...or this purpose they should not be used on other surfaces or components e g painted because they may damage them 9 2 WINDOW PANEL DISMANTLING To clean the window panel combustion chamber or install de...

Страница 34: ...arbon monoxide is a result of defect or leaks in the system Given the impossibility to detect presence of this hazardous gas you should Perform inspections of the system and its maintenance by authori...

Страница 35: ...pr assembly of window panels iv decorative items supplied with the equipment or purchased by the customer v all damages resulting from incorrect transport from distributor to the customer incorrect i...

Страница 36: ...accept the claim and to charge its costs to buyer 25 Provisions of this document shall not limit in any way the rights resulting from the claim filed based on the statutory guarantee The warranty doe...

Страница 37: ...s been delivered as complete the device showed no failure during the first start up carried out by a service company has received the Operating Manual and equipment s installation manual with this War...

Страница 38: ...38 15 CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE No date fault description repaired element description of repairs comments Stamp and signature of Service 1 2 3 4 5 6 7 8 9 10...

Страница 39: ...s been delivered as complete the device showed no failure during the first start up carried out by a service company has received the Operating Manual and equipment s installation manual with this War...

Страница 40: ...40...

Страница 41: ...technician Way of fault removal Advice DESCRIPTION END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint Duration of repair Fault defect has been removed th...

Страница 42: ......

Страница 43: ...hnician Way of fault removal Advice DESCRIPTION END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint Duration of repair Fault defect has been removed the eq...

Страница 44: ......

Страница 45: ...technician Way of fault removal Advice DESCRIPTION END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint Duration of repair Fault defect has been removed th...

Страница 46: ......

Страница 47: ...47 20 REGISTER OF INSPECTIONS OF SMOKE DUCTS date stamp and signature of chimneysweep date stamp and signature of chimneysweep...

Страница 48: ...mbol Unit value Heat output Rated heat output Pnom kW 6 0 Minimum heat output Pmin kW 3 6 Performance Performance at rated thermal power th nom Performance at minimal thermal power indicative th min A...

Страница 49: ...ol Unit Value Heat output Rated heat output Pnom kW 5 5 Minimum heat output Pmin kW 3 3 Performance Performance at rated thermal power th nom Performance at minimal thermal power indicative th min Aux...

Страница 50: ......

Страница 51: ...51...

Страница 52: ...509 702 720 509 577 900 DEFRO Sp ka z ograniczon odpowiedzialno ci Sp ka komandytowa 00 403 Warszawa ul Solec 24 253 Production plant Ruda Strawczy ska 103 A 26 067 Strawczyn tel 41 303 80 85 biuro d...

Отзывы: