Description of Menu Options
Configuring the Module 3–37
[6] Downline Upgrade (Cont.)
DLU Process Completion
When the DLU process is complete, the module resets and initiates self-
test. After self-test completes successfully, the module exits from the
DLU process and begins the execution of the new firmware image. The
Module OK LED
turns on and the module becomes fully
operational.
If the module is installed into a DEChub ONE, the setup port device
displays the PORTswitch 900FP Installation menu.
If the module is installed into a DEChub 900, the Hub Manager status
display shows the following message:
3: PORTswitch 900FP
up
When you press <Return>, the screen displays the
PORTswitch 900FP
Installation menu.
Содержание PORTswitch 900FP
Страница 23: ...Module Components PORTswitch 900FP Description 1 5 Front Panel Figure 1 1 PORTswitch 900FP Front Panel...
Страница 25: ...Module Components PORTswitch 900FP Description 1 7 Figure 1 2 PORTswitch 900 FP Back Panel...
Страница 26: ......
Страница 36: ......
Страница 78: ......
Страница 82: ......
Страница 102: ......
Страница 110: ......
Страница 114: ......