Installing the Module 2–1
Chapter
2
Installing the Module
Overview
Introduction
This chapter describes the tasks necessary to install the module.
What do I Need to Know?
The PORTswitch 900FP hot-swap feature allows you to install the
module into the DEChub 900 or DEChub ONE docking station without
turning off power. Seating the module initiates the powerup sequence if
enough power is available.
In this Chapter
This chapter includes the following topics:
Topic
See Page
Installing the Module
2-2
Before Connecting the Cables
2-5
Configuring the Ports
2-6
Содержание PORTswitch 900FP
Страница 23: ...Module Components PORTswitch 900FP Description 1 5 Front Panel Figure 1 1 PORTswitch 900FP Front Panel...
Страница 25: ...Module Components PORTswitch 900FP Description 1 7 Figure 1 2 PORTswitch 900 FP Back Panel...
Страница 26: ......
Страница 36: ......
Страница 78: ......
Страница 82: ......
Страница 102: ......
Страница 110: ......
Страница 114: ......