
Description of Menu Options
Configuring the Module 3–31
[6] Downline Upgrade (Cont.)
Table 3-2: DLU Process Description (Cont.)
Stage
What Happens
4
The module resets, runs self-test, and then begins
executing the new firmware image.
This stage normally takes 1 minute to complete.
The following states indicate that this stage is in progress:
•
Module status – not functional during reset and self-test.
•
Module cannot respond to management requests.
•
The power LED
remains on. The module OK LED
and the #5 port state LED turn off. The LEDs display
the self-test sequence.
•
HUB Manager display –
PORTswitch 900FP
unknown
After the successful completion of self-test, the module OK
LED
turns on and the module becomes fully operational
and manageable. Note also that the HUB Manager display
indicates:
PORTswitch 900FP
up
Содержание PORTswitch 900FP
Страница 23: ...Module Components PORTswitch 900FP Description 1 5 Front Panel Figure 1 1 PORTswitch 900FP Front Panel...
Страница 25: ...Module Components PORTswitch 900FP Description 1 7 Figure 1 2 PORTswitch 900 FP Back Panel...
Страница 26: ......
Страница 36: ......
Страница 78: ......
Страница 82: ......
Страница 102: ......
Страница 110: ......
Страница 114: ......