
50mm
27mm
PS-2 Upgrade Kit Installation Guide
Installing The PS-2 Components
Onto The Locomotive Chassis
Once the existing electronic components have been removed from your
locomotive, begin locating the best mounting position for the PS-2 components.
The major components are the PS-2 board, PS-2 Heat Sink Bracket, the speaker
and the rechargeable battery pack. The speaker can often be installed in the fuel
tank (if your locomotive is so equipped) leaving the chassis areas in front of,
between, and behind the motors for the remaining PS-2 equipment.
This Premier Line GG-1 features no fuel tank, so the speaker must be mounted onto the
chassis.
100mm
60mm
18mm
30mm
39mm
11