
DBA LaneWalker Model C Operating Manual
·
Page 34
Section VII • DBA LaneWalker Maintenance Inspections
The following pages contain the suggested maintenance to be performed at 10, 50,
and 100 miles of operation. These inspections and adjustments are necessary so that the
DBA LaneWalker can operate in peak condition.
It is recommended that the operator check off the maintenance items as they are
completed for each inspection. Upon completion, the bowling center supervisor should
review the inspection with the operator, sign the form, and then clear the maintenance
message on the LaneWalker keypad.
Estimated time to complete each maintenance inspection is as follows:
10 Mile:
30 to 45 minutes
50 Mile:
45 minutes to 1 hour
100 Mile:
90 minutes to 2 hours
COMPLETE EVERY 10 MILES OF OPERATION
(Use special 50 and 100 Mile Checklist at Appropriate Times)
NOTICE TO LANEWALKER OPERATORS:
When the LaneWalker 10 Mile
Maintenance Inspection is due, please examine the entire machine thoroughly,
paying close attention to the items listed below on the 10 Mile Maintenance
Checklist. When your inspection and repairs are complete, review what has been
done with your Supervisor, then have him/her clear the Maintenance Message on
the LaneWalker keypad.
10
mile
20
mile
30
mile
40
mile
60
mile
70
mile
80
mile
90
mile
Clean entire machine thoroughly
Inspect lane to lane casters
Inspect lane to lane wheels
Inspect “hopping” wheels
Check all chain tensions
Remove wicks: inspect & clean
thoroughly with clean, dry cloth
Inspect wick cables, loops and
eye bolts for tightness and
proper operation
Operator’s Initials
Date
Actual Mileage
Supervisor’s Initials
Date