case, the table row is always chosen with reference to the contracted power
of the meter only, leaving out the generation of the photovoltaic system.
DazeBox will automatically be able to recognise when there is photovoltaic
generation and recharge the car without triggering the meter.
4.12. Putting into operation
Pay attention to the following before completing the installation:
▪
Clean the connection area (remove residual material and dirt).
▪
Check the correct attachment of all terminal connections.
After following the installation procedure outlined above step by step,
reassemble the casing.
1.
Refit the DazeBox cover, tightening the four screws with a torque of 2
Nm.
2.
Refit the top cover.
3.
Once installation of the DazeBox is complete, switch on the power
supply from the control panel.
4.
The four status LEDs of the wallbox will light up for a few seconds one
at a time from left to right, until all four light up simultaneously in green
light.
54
Содержание DazeBox C
Страница 1: ...DAZEBOXC Installation Manual...
Страница 3: ...3...
Страница 11: ...11...
Страница 29: ...29...
Страница 30: ...Wiring diagram of three phase DazeBox 30...
Страница 33: ...33...
Страница 57: ...57...
Страница 67: ...The relative humidity of the air must not exceed 95 and condensation must be avoided 67...
Страница 69: ...69...
Страница 70: ...NOTES 70...
Страница 71: ...71...
Страница 72: ...72...
Страница 73: ...CUSTOMER SERVICE PLEASE CALL 035 1983 1355 From Monday to Friday 8 30 13 00 14 00 18 00 FOLLOW US ON...