Other cables to be laid
For the optional Power Management installation, a shielded network cable
must be laid to carry the signal from the PM box to DazeBox. See the
dedicated Dynamic Power Management manual.
For the installation of the release coil, it is necessary to lay a cable to
DazeBox. See specifications in the table below. For cable connection inside
DazeBox see Section 4.10.
Parameter
Specification
Cable type
bipolar
Wire cross-section (copper)
2x 0,5 mm
2
Terminal
ferrule terminals
Stripping length
10 mm
Cable length
coil to DazeBox
Cable outer diameter for passage through
the DazeBox cable gland diaphragm
between 4.5 and 5.5 mm
Other important recommendations
It is recommended to use a lightning rod if the ceraunical level is high or
mandatory if required by local regulations.
It is recommended to protect the wallbox from overvoltages by means of a
device installed inside the distribution board if the regional ceraunical level
(average of lightning strikes falling in the region) is high. A type 2 surge
arrester, Up = 1.5 kV, In = 20 kA, is recommended. The surge protective
device is not a substitute for a lightning arrester, as defined in the applicable
electrical installation regulations.
27
Содержание DazeBox C
Страница 1: ...DAZEBOXC Installation Manual...
Страница 3: ...3...
Страница 11: ...11...
Страница 29: ...29...
Страница 30: ...Wiring diagram of three phase DazeBox 30...
Страница 33: ...33...
Страница 57: ...57...
Страница 67: ...The relative humidity of the air must not exceed 95 and condensation must be avoided 67...
Страница 69: ...69...
Страница 70: ...NOTES 70...
Страница 71: ...71...
Страница 72: ...72...
Страница 73: ...CUSTOMER SERVICE PLEASE CALL 035 1983 1355 From Monday to Friday 8 30 13 00 14 00 18 00 FOLLOW US ON...