Wiring scheme
The wiring scheme for single-phase DazeBox (1P) and three-phase DazeBox
(3P) are shown below.
▪
MCB: overload and short-circuit circuit breaker;
▪
RCD: differential circuit breaker;
▪
CT-L1, CT-L2, CT-L3: current sensors for Power Management.
▪
CT box: device regulating Power Management
▪
kWh: domestic meter.
▪
L01: Power cable, multi-core, 6 mm2 conductors.
▪
L02: 2-core cable 2x0.5 mm2 for release coil connection to terminals
BRK1 and BRK2 (dry contact)
▪
L03: Integrated charging cable Type 2.
▪
L04: Cat. 5e shielded mains cable for Power Management.
▪
L05: Current sensor cable 90 cm long. The maximum guaranteed
length of L04+L05 is 70 meters. For longer lengths please contact
technical support.
Wiring scheme of single-phase DazeBox.
28
Содержание DazeBox C
Страница 1: ...DAZEBOXC Installation Manual...
Страница 3: ...3...
Страница 11: ...11...
Страница 29: ...29...
Страница 30: ...Wiring diagram of three phase DazeBox 30...
Страница 33: ...33...
Страница 57: ...57...
Страница 67: ...The relative humidity of the air must not exceed 95 and condensation must be avoided 67...
Страница 69: ...69...
Страница 70: ...NOTES 70...
Страница 71: ...71...
Страница 72: ...72...
Страница 73: ...CUSTOMER SERVICE PLEASE CALL 035 1983 1355 From Monday to Friday 8 30 13 00 14 00 18 00 FOLLOW US ON...