19532P-76 (09-15)
of 22
9
2. System Cable Wiring
Parts/Tools Required
C95-XXLN System Cable (40877G-XX) One for each Belt Station position to be installed
System Cable labels
Tape Measure
Procedure
Determine the locations of each intercom position. Choose locations based on the customer’s
requirements and maneuverability.
Determine the path of the cable between each position and the Master Station. The cable
should be routed using under-deck conduits and be as far as possible from radio antenna coax
cables and anywhere water may collect.
Route the cable. Start at the Belt Station location and feed the end with 2½” of insulation
removed toward the Master Station. The end with the large Nexus jack connects to the Belt
Station. Use grommets each time the cable is passed through a wall or surface. Use wire ties
where necessary.
Determine the function of the position (Captain, Co-Captain, Crew1, Crew2). Insert the cable
into the correct cable fitting on the Master Station. The correct fitting to use is dependant upon
the function of the position, see
Appendix A
.
Pull cable through fitting approximately 2-3 ft to allow room for termination.
Using the provided cable labels, label the cable once it is through the fitting and inside the
Master Station (
Figure 4
).
Repeat this procedure for each Belt Station position you are installing.
Termination of this end of the cable is performed in
Section 6
.
Содержание 9500 SERIES
Страница 2: ......
Страница 4: ......
Страница 10: ...19532P 76 09 15 of 22 6 Figure 2 Mounting the Master Station ...
Страница 11: ...19532P 76 09 15 of 22 7 ...
Страница 12: ...19532P 76 09 15 blank of 22 8 ...