2.
Loosen the nine (9) screws on the rail kit and set the length to fit the depth of your rack
Figure B-2
. Tighten all the
screws once the rail kit is set to the desired length. Repeat for the other rail kit.
3.
Attach the two (2) rail kits to your rack as shown in
Figure B-2
. Make sure you leave enough space for the unit—
bottom of screw plate aligns to bottom of Storage Scaler 6000 chassis.
At the front, use one (1) screw plate, one (1) shelf locking bracket (installed from behind), and six (6) #10 screws.
For the rear end, use one (1) screw plate and four (4) #10 screws.
4.
If the depth of your rack is more than 25.5 inches (647 mm), attach the two (2) Cable Management Arm (CMA)
brackets to the rear end of the rail kits
Figure B-2
.
Figure B-2. Attach Rail Kits to Rack
Attach Screw Plate
with (6) #10 Screws
Shelf Locking Bracket
installed from Behind
Bottom of Screw Plate Aligns
to Bottom of Chassis
Front of Rack
Attach Screw Plate
with (4) #10 Screws
Attach (2) CMA Brackets
Loosen (9) Screws to
Adjust Rail Kit Length
USO
RESTRITO