G 6 4 0 M i c r o I n v e r t e r
U s e r M a n u a l
G 6 4 0 U M d r a f t
v1 20180928
© 2 0 1 8 D a r f o n E l e c t r o n i c s C o r p .
p . 1 3 / 1 9
Junction Box. The PLC Box will need to be placed in and secured to the AC
Junction Box. The wires in the AC trunk cable are identified by color
Step 3:
Connect the Data Logger to the Router
Place the data logger (model: DDL100 or DL200) near the router, then make
a direct Ethernet connection. If the data logger cannot be placed near the
router, then the installer can add either a wireless access port or a power
line communication port (not supplied with the micro inverter).
Note: To mount the data logger, use the included wall-mount frame.
Step 4:
Connect the Data Logger to the PLC Box
Insert the red/black wiring into the RS485 connectors, and then
insert the connectors into the Data Logger and PLC Box. (Ensure
there is length of the red/black wiring is sufficient for installation)
Note: Ensure the RS485 connectors are wired properly:
Data Logger RS485 D+
PLC Box RS485 T +
Data Logger RS485 D-
PLC Box RS485 T
–
Note: If installing more than one PLC Box in the system, daisy-chain the PLC
Boxes together using RS485 cables. Then connect the last PLC Box in the series to
the Data Logger using the RS485 cable.
Step 4: Connect Power
Plug in the Data Logger into the AC outlet. (Be sure the adapter is connected to
the Data Logger before it is plugged into to the outlet.)
Содержание G640
Страница 1: ...G640 MI CRO I NVERTER U S E R M A N U A L...